| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/06/2022 | SHASEMA1 | ENGINEERING | REVIEW | Approved | |
| 09/07/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 09/07/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 09/10/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM06380 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. The Seismic Parameters shown on Drawing S0.1 does not match with Geotechnical Report or the Structural Calculations. Make revisions as needed. 2. Provide Shear walls analysis for the building how the Lateral Loads are transferred to the Foundations. 3. Provide calculations analyzing the Center of Loading and the Center of Rigidity of the Lateral Load Resisting system of the building. BUILDING REVIEW COMMENTS: Denied 1. The north wall is within 5' of the property line, which would require a 2 hour rating. The UL listing drawing is provided, however, which assembly type that is being used has not been indicated and does not match the wall type being used. Provide clarification and what assembly is being used to achieve the two hour rating MECHANICAL REVIEW COMMENTS: Denied 1. Roof hatch shall be located a minimum of 10' from roof edge or protected in an approved manner (MMC2018,304.11 2. Provide 2,000 cfm of outside air to basement , 2,000 cfm for outside air to 1st floor and 2,000 cfm to 2nd floor (MMC2015,403.3.1.1) 3. What type of forklifts are being used in this building electric or fuel (MMC2018,106.3.1) 4. All FCU's that share common return duct through the outside air duct shall be protected with a duct smoke detector in the return of the FCU from basement to 2nd floor (MMC2018,606.2.2) 5.Provide outside air flow for FCU's and RTU on sheet m0.1 and M0.2 it is missing (MMC2018,106.3.1) 6. All intake louver's shall be 10' horizontally from or 25' above vents, streets, alleys. parking lots and loading docks (MMC2015,401.4 ELECTRICAL REVIEW COMMENTS Denied 1. All sheets: A notation beneath the seal either written, typed, or electronically generated that provides the day, month, and year of expiration of current registration. Arizona R4-30-304(R)(4) 2. Sheet E0.4, E1.0, E1.1, E1.2, E1.3, E2.0, E2.1, E2.2, E2.3: Show compliance for branch circuits and feeders to comply with voltage drop requirements in 2018 IECC, C405.9 3. Sheet E1.0, E1.1, E1.2, E1.3: Show a lighting control narrative / matrix / table for all interior lighting. 2018 International Energy Conservation Code C103.2 4. Sheet E1.0, E1.1, E1.2, E1.3: Show location of daylight zones on lighting floor plan. 2018 International Energy Conservation Code C103.2 5. Sheet E1.0, E1.1, E1.2, E1.3: Show a note to all lighting sheets to provide direction for compliance with 2018 IECC, C408.3.1 functional testing of lighting controls. 6. Sheet E1.0, E1.1, E1.2, E1.3 Show calculation or documentation that emergency luminaires can provide initial illumination not less than the value required in the IBC 2018, 1008.3.5 along the path of egress at floor level. IBC 2018, 1008.3.5. 7. Sheet E3.0: OFFICE (100) has two exits. Illuminated exit sign is required on both doors for path of egress travel. IBC 2018 1013.1 and IBC 2018 1013.3. 8. Sheet E4.0: For SES service equipment, show date maximum available fault current calculation was performed. NEC 2017, 110.24 PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). High low drinking fountain & Mop sink info missing from plan page P0.1 Fixture schedule. -IPC 106.3.1, 303 2). Plan Pg. P2.0 needs to show the TMV indicator at each lavatory. -IPC 419.5 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 09/14/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 09/19/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Sheet T1.0: Deferred submittals show approval required from State of Arizona but TFD is the AHJ for the fire sprinkler, fire alarm, ERRC shall be tested by PCWIN and the report provided to TFD, Underground fire line and emergency access. Sheet T1.0: states that the elevator shall be code complaint, note shall also be added that the elevator be compliant with the 2018 IBC, Chapter 30, Section 3001.2 Provide detail and rating of I-beam located at the top of the elevator shaft meets the ASME, OSHA and manufacturer specifications. Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/19/2022 | VVERA1 | OUT TO CUSTOMER | Completed |