Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM05805
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2022 | WBERGER1 | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Wyatt Berger Planner PROJECT: T22CM05805 925 E Mill St TI: Millville Studios (1st Review) TRANSMITTAL DATE: August 11, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. As it appears you are proposing a change of use from Commercial Storage to Technical Service with an accessory General Merchandise Sales use, one of the following is required: a. Provide an approved Certificate of Occupancy for a use with a motor vehicle parking requirement of one space per 300 sq. ft. gross floor area; b. Demonstrate that the required vehicle parking for these uses is provided on site; or c. Show that you meet the requirements of UDC 3.3.3.H in addition to complying with UDC 3.3.3.H.9.a or .b, specifically. If any of the above cannot be met, a development package is required. The DP is a separate submittal and shall be submitted at https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using Submission Type "Site Review." If you have any questions about this transmittal, please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov. |
| 08/11/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 08/16/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 08/19/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Completed | |
| 08/22/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/22/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise detail 206 (lift station) to provide a full-open valve on the discharge side of the integral check valve. Reference: Section 712.2, IPC 2018. 2. Verify that the connection point for the 1-1/2" forced waste pipe to the building drainage system is at least 10 pipe diameters from the base of any soil or waste stack or any fixture drain. Reference: Section 712.3.5, IPC 2018. |
| 08/22/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Show the location of the reduced pressure backflow assembly on the drawings; indicate the size of the assembly. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf |
| 08/24/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/15/2022 | JVINCEN1 | FIRE | REVIEW | Reqs Change | Confused about fire sprinklers. Existing documents show the basement was sprinklered. -Does the basement have fire sprinkers? -Fire sprinklers required in basement per IFC 903.2.11.1. Install fire sprinklers in basement or show how you meet 903.2.11.1 & 903.2.11.1.3. john.vincent@tucsonaz.gov 5203495581 |