Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM04809
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/11/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04809 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved In the proposed TI work the structural work related to TI and RCP is approved. Review related to replacement/ connection of RTU's and connection of ductless units has not been provided as no such details are available for review. A separate review for Mechanical unit connections may not be required if both the conditions listed below are met: 1. Replacement unit weighs and its height being the same or less than the replaced unit, and 2. Connections are made to the same framing members as before, no new point loads are created. If any of the above two conditions are not met then a structural review is required. BUILDING REVIEW COMMENTS: Denied Sheet A1.0 – Provide detailed description of the scope of work. What kind of business is this (B occupancy)? What kind of products are being made (Occupancy F-1)? What is going to be stored in the warehouse? Is there high pile storage or hazardous materials? What is the existing space occupancy? Sheet A1.0 – Provide deferred submittal items. Fire sprinkler? Fire alarm? Signage? Sheet A1.0 – Provide fire alarm analysis. Yes, or No? Sheet A1.0 – Existing/Demolition architectural plan missing. Provide demolition plans to show scope of work. Sheet A1.0 – Provide occupancies of each suite in referenced site plan. What are the occupancy groups in this building and adjacent wall? Sheet A2.0 shows door 101A connecting to adjacent tenant. What is the adjacent occupancy group? Sheet A1.0 – Provide allowable area calculation of this building per 2018 IBC 506. What are other occupancy groups, and do they meet the allowable area requirements? Sheet A1.0 – Exiting schedule does not show required and provide travel distance to exit. Life safety plan – Provide complete life safety plan per 2018 IBC Chapter 10. Exiting plan and means of egress analysis missing. Provide provided and required common path of travel, dead end corridor, diagonal exit distance and remoteness of exit doors, total distance to exit, fire extinguisher location, exit and door and width, exit lights, etc. Life safety plan – What are the exit travel distance from most remote open office 119 and office 121 to exit door? Sheet A2.0 – Exit doors do not provide remote distance per 2018 IBC 1007.1.1 two exists doorways. Only two exit doors provided at the South wall of manufacturing area where business occupants exit through storage (2018 IBC section 1016.2 5). Provide means of egress analysis using life safety plan. Sheet A2.0 – Identify warehouse storage unit system. Is it high piled storage per 2018 IFC chapter 32? Identify storage unit and material being stored. Sheet A2.0 – Provide warehouse guardrail details. Sheet A2.0 – Provide warehouse bench details. If fixed, then provide detail attachment to concrete floor. Sheet A2.0 – Key note 7 identifies “equipment,” what is this? Provide specification for this equipment. Sheet A3.0 – Provide ceiling height of warehouse 101? Is this for high piled storage? Sheet A3.0 – What is “O.T.S”? This is not identified in material legend. Roof plan – Provide existing/demolish and new roof plans. Locate new roof top units, roof access, exhaust, penetration details, roof details, etc MECHANICAL REVIEW COMMENTS: Denied 1. Provide exhaust to women's restroom sheet M1.0 (IMC2018,403.3.1.1) ELECTRICAL REVIEW COMMENTS Conditionally Approved 1. Sheet E1.3: In warehouse 101, office 116 occupant sensor controls shall be installed to control lights. IECC 2018, C405.2.1 PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Provide demo plan -IPC 106.3.1 2). This occupancy requires a high/low drinking fountain, if existing show location- IPC 403.1 3). Lavatories on P1.0 fixture schedule need ASSE 1070 mixing valves. -IPC 419.5 4). Illustrate the condensate piping to the service sink not the shower on plan page P1.0 - -IPC 314.2.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
07/14/2022 | PCAMARE1 | ENGINEERING | REVIEW | Passed | |
07/15/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/15/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/27/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/09/2022 | JVINCEN1 | FIRE | REVIEW | Reqs Change | See building comments. john.vincent@tucsonaz.gov 5203495581 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/09/2022 | VVERA1 | OUT TO CUSTOMER | Completed |