Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM04613
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/05/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04613 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The General Building Summary on sheet A0 indicates an assembly occupancy load of 61. According to 2018 IBC Table 1006.2.1 the maximum occupancy allowed would be 49 people with only one exit. Correct the chart to indicate two exits are required. 2. Indicate a walkway from the second exit by the toilet room that connects to a public way or street on the plans. 2018 IBC 1028.5 3. Note the location of the composting toilet leaching bed and interceptor on the site plans, it appears they will be located within the required setback. 4. N/A 5. Provide interior elevations of the Prep Room and toilet room fixtures. Indicate the required heights, grab bars, clearances, and other requirements for accessibility in accordance with 2018 IBC Chapter 11 and ADA. 6. Provide an enlarged floor plan for the toilet room that includes specific dimensions and clearances for the plumbing fixtures as well as a turn around space per ADA including the door approach from the exterior. MECHANICAL REVIEW COMMENTS: Denied 1. Correct the door and wall configuration for the entry into the Prep Room and add the door to the vertical duct area/small storage room to the plans. Remove the pass thru window and relocate the thermostat accordingly. 2. Provide a manual J and S for the sizing of the new mechanical equipment. ELECTRICAL REVIEW COMMENTS Denied 1. Correct the door type for the vertical duct area/ small storage room, it is shown as a swing door not a pocket door on the floor plans. Depending on the location of the vertical ductwork, the new light and switch may not work as indicated. PLUMBING REVIEW COMMENTS: Denied 1. Provide a plumbing fixture schedule for the project on the drawings. The general Isometric note on sheet P1 references the plumbing schedule, but none could be found. 2. Note on the drawings that the new composting toilets will meet the requirements for Pima County Department of Environmental Quality and Arizona Administrative Code Title 18. Chapter 9. The typical masonry 2 chamber system detail top view on sheet A2 indicates to see accompanying text for sizing and number of users however this information can not be located. 3. Provide information on the composting toilets that indicate compliance with accessibility requirements. 2018 IBC 1109.2 and ADA. 4. Correct the door type for the vertical duct area/ small storage room, it is shown as a swing door not a pocket door on the floor plans. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 07/11/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide a site drawing showing the size and route of the water service to buildings 1 and 2 along with the location and size of both the water meter and the reduced pressure backflow preventer assembly serving these buildings. Reference: Section 107.2.1, IBC 2018. 2. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply to become overloaded. Reference: Section 603.1, IPC 2018. |
| 07/13/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM04613 – DP21-0363 1137 N Dodge Blv – R-2 Building Addition – Cultural Use (1st Review) TRANSMITTAL: June 23, 2022 This site is located in R-2 Zone (UDC 4.7.9), Cultural Use is an allowed use in the zone (UDC Table 4.8-2), subject to Use Specific Standards 4.9.3.C.2 -.8. 1. Zoning as reviewed the building plans for compliance with DP21-0363 and although the plans appear to match until the DP is approved Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
| 07/13/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 08/08/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 08/24/2022 | SBLOOD1 | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/24/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |