Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM04231
Parcel: 13615001B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM04231
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/20/2022 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet S1.2 (Existing Foundation Plan); Sheet A21 (Floor Plan): It does not appear some of the new 2x4 stud walls indicated on the Existing Foundation Plan match the new walls indicated on the Floor Plan. Please verify.
2. Sheet A21; Floor Plan: Please indicate all new Wall Types on the new walls indicated on this plan.
3. Sheet A42; Mounting Heights: Please indicate the dimension of the vertical grab bar from the floor.
4. General: Please provide written responses to all review comments.
06/21/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
06/21/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
2. Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09..
06/21/2022 ROBERT SHERRY WATER REVIEW Completed
06/23/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change How are the bathroom exhaust fans controlled? Please show this on the electrical plans.
Ref; 2018 IBC 107.2.1, 2017 NEC.
07/01/2022 SSHIELD1 ENGINEERING REVIEW Passed
07/01/2022 STEVE SHIELDS ZONING REVIEW Approved
07/01/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/18/2022 JPEELDA1 FIRE REVIEW Approved