Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T22CM04001
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/11/2022 | LEVANS2 | ENGINEERING | REVIEW | Reqs Change | Combo permits cannot be approved until their associated development package has been approved. Lianne Evans lianne.evans@tucsonaz.gov |
10/13/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04001 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E6.1 Electrical Panel Schedules: Panels NH 3 & 4 do not require 1000 amp buses. PLUMBING REVIEW COMMENTS: Denied Third Plumbing Review: 1 thru 4 OK 5). Now that plumbing plans have been included, they need to be accompanied by the civil plans for water service & sewer continuation as stated on plumbing pages. -IPC 106.3.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
10/13/2022 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM04001 – Tucson Commerce Center Building Plan Review (3rd Review) 3780 E Valencia Rd / I-1 TRANSMITTAL DATE:?October 13, 2022 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2. COMMENT: Zoning has reviewed the building plans for compliance with the associated Development Package DP22-0100. Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |