Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T22CM04001
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/20/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04001 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1.Provide ventilation calculations (IMC2018,,403.3.1.1.1) to show how you are going to meet the 4% openable area to the outdoors for natural ventilation Not Complied 2. Provide a detailed narrative on the process that occurs in the warehouse (e.g. what materials are you storing in the warehouse, what type of forklifts are you using in the warehouse is it fuel or electric) (imc2018,106.3.1) Not Complied 3. Mechanical plans need to be submitted, there is no such thing as design build in the code only deferred submittals (IMC2018,106.3.1) ELECTRICAL REVIEW COMMENTS Denied Electrical code compliant plans are needed to obtain an electrical permit. No plans were submitted. PLUMBING REVIEW COMMENTS: DeniedSecond Plumbing Review: 1 thru 3 OK 4). SAME-No Building drain or water stub ins or any plumbing plans shown on these plans? - IPC 301.3 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
07/22/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
07/28/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
07/28/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: T22CM04001 – Tucson Commerce Center Building Plan Review (2nd Review) 3780 E Valencia Rd / I-1 TRANSMITTAL DATE: July 28, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plans for compliance with the associated Development Package DP22-0100. Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov |
08/31/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans can be approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |