Permit Number: T22CM04001
Parcel: 14041124E

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM04001
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/08/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM04001

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Verify the design lateral pressure from the surcharge loads are included in the lateral earth pressure load and design of the foundation wall as indicated in IBC 2018 Section 1610.1
2. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed. Where steel joists are used with columns that are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. Where constructability does not allow a steel joist to be installed at the column the joists are to be stabilized on both sides of the column.
3. Except for steel joists that have been pre-assembled into panels, connections of individual steel joists to steel structures in bays 40 feet or more shall be fabricated to allow for field bolting during erection.
4. Provide a vertical stabilizer plate at columns for steel joist as required by OSHA 1926.757.
5. Verify OSHA steel erection standards for open web steel joists. Section 1926.757 (a)(8) requires connections of individual steel joists to steel structures in bays of 40 feet or more shall be fabricated to allow for field bolting during erection.
6. Bracing is shown along line 10 in the North South Direction. Verify lateral loading is resisted by the end walls in NS and EW directions and transferred to the foundations safely.
7. Show lines of bridging for the steel joists per the recommendation of the Joist Manufacturer.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
1. Sheet A0.0: Remove the references to the Idaho State Plumbing Code.
2. Sheet A0.0: ESFR is not a sprinkler system type. It is a sprinkler head type. Provide the sprinkler system type being used. (NFPA 13)
3. Sheet A0.0: Why are frontage increases being applied if the building qualifies for unlimited area? Provide clarification and complete frontage increase calculations.


MECHANICAL REVIEW COMMENTS:
Denied
1.Provide ventilation calculations (IMC2018,,403.3.1.1.1) to show how you are going to meet the 4% openable area to the outdoors for natural ventilation
2. Provide a detailed narrative on the process that occurs in the warehouse (e.g. what materials are you storing in the warehouse, what type of forklifts are you using in the warehouse is it fuel or electric) (imc2018,106.3.1)


ELECTRICAL REVIEW COMMENTS
Denied
There is no current electrical design to review or approve.
Electrical is Design Build and is called out as a Deferred submittal.
Submit when required by local AHJ
Electrical is not approved until deferred design is submitted.


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Cover Sheet code summary is calling out 2017 Idaho Plumbing Code? Should be 2018 International Plumbing Code
2), Add Gutter & downspout sizing calculations to plan page A2.4 -IPC 1106.1, 1106.3, 1106.6
3). Add a Downspout grade level connection detail to plan page A2.4 - IPC 1101.6
4). No Building drain or water stub ins shown on these plans? - IPC 301.3



If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
06/16/2022 ROBERT SHERRY WATER REVIEW Passed
06/21/2022 IMONSHI1 ZONING REVIEW Reqs Change FROM: Iman Monshizadeh
PDSD Zoning Review Section

PROJECT: T22CM04001 – Tucson Commerce Center
Building Plan Review (1st Review)
3780 E Valencia Rd / I-1

TRANSMITTAL DATE: 6/21/2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1.COMMENT: Zoning has reviewed the building plans for compliance with the associated Development Package DP22-0100. Zoning cannot approve the building plans until the DP is approved.

2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the Development Package.

3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning.

If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov
06/21/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Reqs Change Impact fees will be assessed when zoning review is complete.
06/28/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments
07/07/2022 JVINCEN1 FIRE REVIEW Reqs Change See building comments

john.vincent@tucsonaz.gov
5203495581

Final Status

Task End Date Reviewer's Name Type of Review Description
07/07/2022 VVERA1 OUT TO CUSTOMER Completed