Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM03954
Parcel: 140440040

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM03954
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2022 VFLORES1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Reqs Change PLEASE CONTACT PC ADDRESSING BUILDING NUMBER NEEDS TO BE ASSIGNED PRIOR TO ISSUANCE PH# 520-724-9512, ADDRESSING@PIMA.GOV
06/14/2022 JPEELDA1 FIRE REVIEW Reqs Change Plans shall show the following as deferred submittals:
Fire sprinkler underground plans shall be submitted to and a permit obtained from TFD
Fire sprinkler plans shall be submitted to and a permit obtained from TFD
Fire alarm plans shall be submitted to and a permit obtained from TFD
The building shall be tested for Emergency Responder Radio Coverage by PCWIN and results provided to TFD
Owner shall provide KNOX Boxes, KNOX locking FDC Caps and KNOX Gate key switches
Show the location of the fire riser rooms and F.D.C. Location
Plans shall show fire department aerial access compliant with IFC 2018, Appendix D, Section D105
Doors shall be compliant with IFC 2018, Chapter 32, Section 3206.7
Notes shall be on construction drawings stating that awning, solar shades and or canopies shall not be installed over the parking in the area designated as aerial access.

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@tucsonaz.gov
520-837-7033Fire Plans Examiner
06/15/2022 ROBERT SHERRY WATER REVIEW Completed
06/15/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM03954

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1.
2. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed. Where steel joists are used with columns that are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. Where constructability does not allow a steel joist to be installed at the column the joists are to be stabilized on both sides of the column.
3. Except for steel joists that have been pre-assembled into panels, connections of individual steel joists to steel structures in bays 40 feet or more shall be fabricated to allow for field bolting during erection.
4. Provide a vertical stabilizer plate at columns for steel joist as required by OSHA 1926.757.
5. Verify OSHA steel erection standards for open web steel joists. Section 1926.757 (a)(8) requires connections of individual steel joists to steel structures in bays of 40 feet or more shall be fabricated to allow for field bolting during erection.
6. Verify the design lateral pressure from the surcharge loads are included in the lateral earth pressure load and design of the foundation wall as indicated in IBC 2018 Section 1610.1
7. Show lines of bridging for the steel joists per the recommendation of the Joist Manufacturer.
8. Refer to Structural Drawing S0.3, Joist Purlin (JP) Schedule. The Schedule shows Purlin Mark JP1B. Verify if this mark is used anywhere on the Roof Framing Plans S3.1 or S3.2. If not, remove the Mark from the Schedule.
9. Refer to Structural Drawing S2.1. Provide missing Foundation Mark for the Foundation located near Lines E and 14.
10. Verify how steel columns are stabilized at roof level where columns are framed to Joist girders only in one direction and no Steel Joists Framing into Columns in the other direction.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Denied
1. Provide mechanical plans (IMC2018,106.3.1)
2. Provide ventilation calculations (IMC2018,,403.3.1.1.1)
3. Provide a detailed narrative on the process that occurs in the warehouse (e.g. what materials are you storing in the warehouse, what type of forklifts are you using in the warehouse is it fuel or electric) (imc2018,106.3.1)


ELECTRICAL REVIEW COMMENTS
Denied
E0.0 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX: No electrical issues
E0.1 ELECTRICAL LEGEND: No electrical issues
E1.0 ELECTRICAL SITE PLAN: No electrical issues
E1.1 PHOTOMETRIC PLAN: Need to provide an exterior lighting power density calculation per Tucson City requirements.
E1.2 LUMINAIRE SCHEDULE AND FIXTURE CUT-SHEETS: No electrical issues
E4.1 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN:
Need to provide interior lighting a minimum level ie stumble lighting, emergency lighting, and exit signage.
Need to provide an interior lighting comcheck to show compliance to 2018 IECC code.
Need to provide service receptacles within 25 feet of any HVAC equipment. Should provide an additional 4-6 receptacles for a Core and Shell design throughout the building.
E4.2 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN: See comments on E4.1.
E6.0 ELECTRICAL ONE-LINE DIAGRAM: No electrical issues


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). Plan submittal needs to include site utility piping plan for continuation of water, sewer, storm piping. -IPC 106.3.1
2).. Add storm piping material types to plan page MP0.0. -IPC 1102


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
06/21/2022 WBERGER1 ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Wyatt Berger
Planner

PROJECT: T22CM03954
4150 E Los Reales Rd
New industrial warehouse building (1st Review)

TRANSMITTAL DATE: June 21, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Zoning has reviewed the building plans for compliance with DP22-0122. Although it appears that the building plan matches the DP, Zoning cannot approve the building plan until the DP is approved.

If you have any questions about this transmittal, please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov.
06/21/2022 WBERGER1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
06/28/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments
10/14/2022 LMAKUS1 LANDFILL REVIEW Passed Greater than 1000 feet.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/14/2022 NGARCIA3 OUT TO CUSTOMER Completed