Permit Number: T22CM02759
Parcel: 132130720

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM02759
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/26/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T22CM02759
1260 E Tucson Market Place Bl – DP21-0296
Retail Addition (1st Review)

TRANSMITTAL: April 26, 2022

This site is located in the PAD-15 Retail is an allowed use in the PAD.

1. Zoning has reviewed the building plans for compliance with DP21-0296 and although it appears that the plans are in compliance until the DP. Zoning cannot approve the building plans until the DP is approved by all review agencies.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
04/26/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/27/2022 JPEELDA1 FIRE REVIEW Approved
04/29/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM02759
GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. The Design Base Shear (V) for design loads (Seismic) are shown on Structural Drawing S0 as 0.057W. The Structural Calculations submitted shows it as 0.081W on page 8. Verify and submit response.
2. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1.
3. Refer to Detail 1 on Drawing S0, Partial Roof Plan-Remote Condenser support Framing. A new condenser unit weighing 1500 pounds is being added. Submit adequacy of existing roof framing. Justify with structural calculations if any reinforcing is required to the existing supporting members.
4. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
1. Sheet C1: The maximum allowable sq. ft. is exceeded. Section 1102.2 of the IEBC states that additions are not permitted to increase the area of the existing building beyond what is permitted by Ch. 5 of the IBC. The building is indicated as Type V-B construction. Since the building is already beyond the permitted area this addition cannot be added. Provide clarification on the existing construction type and the proposed addition. Ensure the existing construction type is correct.
2. Sheet LS1: The exit access travel paths do not indicate the distances traveled. Provide the travel distances lengths on the Life safety plan.
3. Provide a comprehensive schedule of special inspections along with all applicable paperwork.


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
1. Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E1.1 ENLARGED LIGHTING PLANS: Should provide a General Lighting note to call out that hexagon numbers are fixture types as per schedule shown on E1.3.
E2.3 ENLARGED POWER PLANS: Could not locate Keynote 16.492.
E4.1 PANELBOARD SCHEDULES: Review RTU 30 circuit in panel H2A. May need to be upsized 125% per NEC for continuous loads and motor loads


PLUMBING REVIEW COMMENTS:
Denied
1). Add primary & secondary roof drain location info/illustrations to plan page A4 -IPC 1101.2
2). add roof drain/conductor square foot GPM loads to plan page P1. -IPC 1106.2
3). Illustrate new roof secondary roof drain conductors on plan page P1. -IPC 1108
4). Add secondary roof drain assembly info to roof drain schedule on plan page P2. - IPC 1102.6
5). Fixture schedule note B & and notes adjacent to L16/L22 lav specs don't correlate. ( Lavs do require ASSE 1070 mixing valves) -IPC 419.5 Plan Page P2
6). Add floor drain trap primer info to floor drain schedule on plan page P2 -IPC 1002.4.1


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
05/09/2022 ROBERT SHERRY WATER REVIEW Completed
05/26/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments

Final Status

Task End Date Reviewer's Name Type of Review Description
05/26/2022 VVERA1 OUT TO CUSTOMER Completed