Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM02683
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/21/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
04/21/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | FROM: PDSD Zoning Review PROJECT: T22CM02683 402 W Medina Rd - R-1 – DP22-0098 Regional Park – Reid Park Zoo World of Play (1st Review) TRANSMITTAL: April 21, 2022 This site is located in the R-1 zone (UDC 4.7.8). Parks and Recreation, Regional Park, is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.13.B & C. 1. As DP22-0098 has yet to be accepted for review Zoning was not able to review the building plans for compliance with the DP. Zoning will review the building plans for compliance with the DP once the first DP review is complete. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
04/21/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/26/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM02683 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations for the proposed Foundations, Columns and other Framings per Section 1601.1 of International Building Code 2018. 2. Provide Wind Load Calculations for the proposed construction per Section 1609 of International Building Code 2018. 3. Provide Seismic Calculations for the construction per Section 1613 of International Building Code 2018. 4. Verify foundation design meets the requirements of IBC 2018 Section 1808.7 for foundations adjacent to slopes. 5. Verify the design lateral pressure from the surcharge loads are included in the lateral earth pressure load and design of the foundation wall as indicated in IBC 2018 Section 1610.1 6. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 7. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 8. Refer Drawing SX2.2. The Climbing Structure Deck Framing Plan shows Columns C7 around the perimeter and no foundations have been provided for these columns on Drawing SX2.1. verify and make revisions as needed. 9. DEFERRED SUBMITTAL REQUIREMENTS Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. This playground equipment more resembles a Type U use in lieu of an assembly occupancy. A-5 uses are more appropriate for large grandstands and outdoor stadium and amusement park structures. A type U use is more appropriate. 2. The occupant load seems to not be appropriate for the proposed use. Provide an updated occupant load. 3. Provide accessible play areas in accordance with Section 1108 of ANSI A117 along with all applicable details. 4. Further discussion is recommended for this project. A meeting is recommended to discuss this project. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved ED1.2 PLAY AREA DEMOLITION SITE ELECTRICAL PLAN: Could not locate Keynote #4 on sheet. Review and possibly add punctuation to Keynote #5 ESL0.2 ELECTRICAL CODE COMPLIANCE CALCULATIONS & SCHEDULES: Do not see Keynotes used. ESL1.1 ELECTRICAL SITE LIGHTING PLAN: Do not see Keynote #1 used. EX2.2 CLIMBING STRUCTURE POWER PLAN: 2nd set of General Notes should probably be Keynotes. Could not locate Note #s 10 & 12. One of the Note # 9 markers next to the Mister Pump MP-X1 seemed to be not needed. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Several key notes on plan pages C-1.1 & C-3.1 refer to see details on plan pages CA-2.1 & CA-3.1. Those pages not sent. - IPC A106.3.1 2). All hose bibs on plan page PX2.1 need shut off valves currently shut off valves are only listed for HB-3.. -IPC 606.2 3). All hose bibs need vacuum breakers, update plan page P0.1 or PX2.1.... -IPC 608.16.4.2 4). add the type of piping materials to be used for the sanitary/venting system to plan page PX2.1..... -IPC 702.1 5). Plans need to show sizing, calculations, & continuation of the roof drain conductors to tie in or discharge point. see detail #5 on plan pages AX5.4 & AX5.5..... -IPC 106.3.1, 1101.2, 1106.1, 1106.2 6). What will serve as the secondary roof drain system?, update plans. -IPC Section 1108 7). Show the the roof drain & secondary roof drain locations on plan page AX1.4 -IPC 106.3.1 1101.2 8). Plan Page P0.1 schedule needs to include the roof drain assembly information - IPC 1102.6 9). Add the type of roof drain piping materials to be used to plumbing pages. -IPC 1102.2, 1102.3 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
05/04/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/31/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning Comments |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/31/2022 | VVERA1 | OUT TO CUSTOMER | Completed |