Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM02098
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2022 | IMONSHI1 | NPPO | REVIEW | Passed | |
| 03/23/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
| 03/29/2022 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM02098 Addition 934 W CALLE ANTONIA Zoning R-1 TRANSMITTAL DATE:?March ?29,2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). Based on a wall height of 8’-11” the required perimeter yard setback from the proposed addition to the west property line is 6’-0”, proposed setback is 4’-2”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov. 2.COMMENT: Please show everything existing on the site plan. It appears that there is a storage shed on the north portion of the property. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
| 04/20/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM02098 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. 2018 IRC Section R106.1.1. Revise site plan drawing with locations, sizes, and meters of building utility lines for gas, water, electric and sewer or septic lines from property line to building. MECHANICAL REVIEW COMMENTS: Denied 1. 2018 IRC Section M1501.1 and M1504.3. Revise plans with mechanical exhaust system discharge to the outdoors and not into an attic, soffit, ridge vent or crawl space. ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied 1. 2018 IRC Section P2501 through P3303. Provide plumbing drawings for review before installation. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |