Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM00621
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/15/2022 | ROBERT SHERRY | WATER | REVIEW | Passed | No water service to the building shown. |
02/17/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM00621 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Areas used for storage are to include 25% of the live load in determining the effective seismic weight. Verify the additional load is applied to the mezzanine lateral resisting system as required in ASCE-7 Section 12.7.2. 2. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 3. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 4. Provide galvanized bolts on the roof platform framing connections. 5. Verify Composite Beams and Girders end reactions, how the detailer will provide end connection capacity to transfer the end reactions. 6. Refer to Drawing 2SE122B, Level 2 Framing Plan-Sector B. Girder Size of W21x48 is called along Line 11 between Line B &C and Line C& D and also along 12 between D & E. Verify availability of this size if it’s available, otherwise revise size. 7. Non-load bearing walls require a deflection track or details to allow for the relative lateral deflection of the structural members. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. This review is for the shell and core only. 2. Sheet 2GI101 & 2AC100: The square footage calculations provided on these sheets do not match. Provide clarification or correlated square footage calculations. 3. Sheet 2AC100: The sheet formatting seems to have been corrupted. The height and area information is difficult to read and understand. Please provide a corrected sheet that is legible. 4. Sheet 2AC100: The occupant load factor provided for the inpatient treatment areas on Level 2 is incorrect. Provide an occupant load factor in accordance with Table 1004.5 5. Sheet 2AC100: The occupant load factor provided for the inpatient sleeping areas on Level 2 is incorrect. Provide an occupant load factor in accordance with Table 1004.5 6. Provide the fire evacuation plans and fire safety plans in accordance with Section 403.8.2 and Section 404 of the IFC in the subsequent permit package. 7. Sheet 2AC101: The exit separation measurement is incorrect. It is not measured for the maximum overall diagonal dimension. Provide a corrected exit separation measurement in accordance with Section 1007.1.1. 8. Sheet 2AC101: Interior exit stairway A is not continuous to exit discharge. Provide a continuous exit to exit discharge in accordance with Section 1028.1 and exceptions. 9. Sheet 2AS502: The handrails on the dock stairs do not extend the required distance in accordance with Section 1014.6. 10. NOTE: THE EGRESS PLANS PROVIDED ARE ONLY FOR THE CORE AND SHELL AND WERE REVIEWED ACCORDINGLY. MECHANICAL REVIEW COMMENTS: Denied 1. Provide mechanical plans (IMC2018,106.3.1) 2. Provide a special inspection agency for smoke control approved by the code official (IBC2018,1705.18 &1705.18.2) ELECTRICAL REVIEW COMMENTS Denied 2E002 FIXTURE SCHEDULE AND NOTES: Need to provide an interior and exterior lighting Comcheck. 2E103 ELECTRICAL SITE POWER PLAN: Notes #3, 10, and 13, may want at least one of the conduits to be sized larger ie 1 ½ or 2 inches. PLUMBING REVIEW COMMENTS: Denied Shell Plumbing review: 1). Add gutter sizing & calculations to plan pages 2AE204, 2AE533-IPC 1106.6 2). Add Scupper sizes & calculations to plan pages 2AE533 -IPC 1106.5, 1108.3 3). Add the roof drain piping GPM loads/slope to all of the horizontal sections & also the total GPM loads/slope to each storm Bldg. stub out. on plan pages 2P201A, 2P201B, 2P201C, 2P201D, 2P201E -IPC 1106.2 4). detail #1 on plan page 2P203A should be labeled level 3 5). Shell plan pages don't show any of the sanitary or water systems routing or entry points? -IPC A106.3.1 6). Add NFPA 99 to plan page 2GI101 governing code schedules. -IPC 1202 |
03/01/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM00621 5755 S Houghton Rd – PAD-12 Medical Service Major (1st Review) TRANSMITTAL: March 1, 2022 This site is located in the PAD-12. Medical Service Major is a permitted use in this PAD. 1. Zoning has reviewed the building plans for compliance with DP21-0306, although the footprint appears to match what was shown on the DP, Zoning was not able to compare building heights as no proposed height was provided on the DP. Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov |
03/01/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
03/09/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | FIRE REVIEW COMMENTS: Denied 1. This review is for the shell and core only. 2. Sheet 2GI101 shall have deferred submittals in a box noted as: Fire sprinkler underground plans shall be submitted to and a permit obtained from TFD Fire sprinkler plans shall be submitted to and a permit obtained from TFD Fire alarm plans shall be submitted to and a permit obtained from TFD Building shall be tested for Emergency Responder Radio Coverage from PCWIN and the report provided to TFD 3. Sheet 2GI101 shows that the 2010 Edition of NFPA is being used please correct to the 2016 NFPA 13 4. Sheet 2GI101 & 2AC100: The square footage calculations provided on these sheets do not match. Provide clarification or correlated square footage calculations. 5. Sheet 2AC100: The sheet formatting seems to have been corrupted. The height and area information is difficult to read and understand. Please provide a corrected sheet that is legible. 6. Sheet 2AC100: The occupant load factor provided for the inpatient treatment areas on Level 2 is incorrect. Provide an occupant load factor in accordance with Table 1004.5 7. Sheet 2AC100: The occupant load factor provided for the inpatient sleeping areas on Level 2 is incorrect. Provide an occupant load factor in accordance with Table 1004.5 8. Provide the fire evacuation plans and fire safety plans in accordance with Section 403.8.2 and Section 404 of the IFC in the subsequent permit package. 9. Sheet 2AC101: The exit separation measurement is incorrect. It is not measured for the maximum overall diagonal dimension. Provide a corrected exit separation measurement in accordance with Section 1007.1.1. 10. Sheet 2AC101: Interior exit stairway A is not continuous to exit discharge. Provide a continuous exit to exit discharge in accordance with Section 1028.1 and exceptions. 11. Sheet 2AS502: The handrails on the dock stairs do not extend the required distance in accordance with Section 1014.6. 12.Sheet 2AS510: The international NO PARKING symbol shall be a black P, six inches high. Underneath the NO PARKING symbol, in one-and-five eighths inch high and one-quarter inch stroke, in red lettering it shall read: FIRE ACCESS TOW-AWAY 13. NOTE: THE EGRESS PLANS PROVIDED ARE ONLY FOR THE CORE AND SHELL AND WERE REVIEWED ACCORDINGLY. Governing Codes local and jurisdictional sheet 2GI101 please define if they need to be built to meet the NFPA 99 & 101 Standards so that we can cross-reference for deficiencies. If the elevators are not part of this project please add a note. If they are please provide information regarding the elevators, the use and 2018 IBC code compliance. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov TFD Fire Plans Examiner 520-837-7033 |
03/16/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans can be approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/16/2022 | VVERA1 | OUT TO CUSTOMER | Completed |