| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/23/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
| 03/25/2021 | JPEELDA1 | COT NON-DSD | FIRE | Approved | 1) Angled onstreet parking along Warren is not possible due to roadway width 2) New 5' wide sidewalk and vertical curb along S Warren Av will be required 3) Site visibility at each driveway entrance will need to be provided and maintained 4) Driveway entrances should be 18' radiused curb returns 5) How many peak hour trips are expected from this project. Will vistors or spectators be allowed and are there expected tournaments that would generate more vehicle traffic John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
| 03/31/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | T21PRE0067 1. Site is in a non-designated basin. If submitted after June 1, the sight will be considered balanced for development purposes. Explain permeability of artificial turf. 2. Maximize water harvesting. |
| 04/01/2021 | JVWINKL1 | COT NON-DSD | TRAFFIC | Completed | 1) Angled onstreet parking along Warren is not possible due to roadway width 2) New 5' wide sidewalk and vertical curb along S Warren Av will be required 3) Site visibility at each driveway entrance will need to be provided and maintained 4) Driveway entrances should be 18' radiused curb returns 5) How many peak hour trips are expected from this project. Will vistors or spectators be allowed and are there expected tournaments that would generate more vehicle traffic John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
| 04/01/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | T21PRE0067 - 1145 S WARREN AV - SiteGradingSwpppFloodplain - Footy Park 1. There is an existing 8" cement asbestos water main (WO 2289) on the west side of the property in Swouth Warren Avenue and an existing 8" cement asbestos water main (WO 4914) on the south side of 22nd Street that can supply water to this proposed development. 2. If any new public water mains are to be constructed within this project, the following requirements will apply: a. A water master plan for this project will need to be submitted to Tucson Water's New Development section for review and approval. b. During the master water planning of this project, please plan on looping the on-site water mains to two different points in Tucson Water's existing water distribution system as required by Section 8-06.4.2.A of Tucson Water's Design Manual to meet water quality and fire flow requirements, or explaining what legal and/or technical reasons prevent such looping. c. The new water lines will need to be located within public or private streets to the maximum extent practicable. Where this is not practicable, the new water lines will need to be centered within water line easements that lie on smallest number of private lands possible and are a minimum of 15' wide. d. The Fire Department's fire flow requirements will also need to be shown on the water master plan. e. Upon approval of the water master plan, a detailed water design plan for the new water lined will need to be submitted to Tucson Water's New Development section for review and approval. f. The owner of the property will need to enter into a Construction Agreement with Tucson Water regarding the new water main before water line construction may begin. 3. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 |
| 04/01/2021 | LSHAMIS1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Loran Shamis; Planner PROJECT: Thursday Pre-submittal meeting – T21PRE0067 - Footy Park Address: 1145 S Warren Av Parcel(s): 1298004A, 1290800D Zoning: I-1 Existing Use: Vacant Proposed Use: Commercial Recreation TRANSMITTAL DATE: April 1, 2021 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. This site is in I-1 zone and commercial recreation is permitted in this zone. See Use-Specific Standard 4.9.13.Q. 3. Setback requirements (UDC, Section 6.3.4): a. Eastern property boundary: 1.5 the height of the structure on the eastern boundary of the parcel; for example, 20’ fencing would require a 30’ setback. b. Southern property boundary along 22nd: 21’ or the height of the building (the greater of the two will apply) measured from the back of the existing curb or future curb location. i. Follow up comment: 22nd future ROW width is 120’ and currently the ROW is ~130’ c. Western property boundary along Warren: 21’ or the height of the adjacent structure wall measured from the back of the existing curb or future curb d. Northeastern property boundary along 21st: 21’ or the height of the adjacent structure wall measured from the back of the existing curb or future curb 4. Parking requirements are 15 spaces per field; therefore, the proposed site requires 75 vehicular parking spaces – Since the site is less than 0.25 mile from a transit stop, an individual parking plan may be applicable (UDC, Section 7.4.5.A) 5. Short term bicycle parking requirements are 2 spaces per field; therefore, the proposed site requires 10 short-term bicycle spaces (UDC, Section 7.4.8). 6. A lot combination processed with Pima County will be required for this proposal. 7. If interested in using the southeast corner of the site as access, the applicant must acquire that piece of land or establish an access agreement with the City of Tucson. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at Loran.Shamis@tucsonaz.gov. |