Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T21PRE0022
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/29/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
02/16/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments |
02/16/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | T21PRE0022 1. Site is not critical or balanced. Note that if the Development Package is submitted after June 1, the site will be considered in a balanced basin. Retention and detention will then need to be proportionate to the extent of redevelopment. 2. Show drainage patterns including roof drainage. Primary roof drains must not be directed over sidewalks. 3. Minimum PAAL width is 24 feet. This applies on the north side of the proposed building. Loren Makus, EIT Loren.makus@tucsonaz.gov |
02/16/2021 | MROSS2 | COT NON-DSD | FIRE | Completed | Automatic sprinkler system will be required. A fire hydrand is required withing 600' of all portions of the building and you will need to meet the required fire flow. Michael Ross Michael.Ross2@tucsonaz.gov 520-837-7082 |
02/17/2021 | SAMUEL ROGERS | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Samuel Rogers, Planner PROJECT: Thursday Pre-submittal meeting – T20PRE0022 Address: 6121 E Broadway Blvd Parcel(s): 127-09-0170 Zoning: C-1 proposed to be C-2 Existing Use: Office Proposed Use: Personal Storage TRANSMITTAL DATE: 02/15/2021 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. The setback requirements on the plan are incorrect, on sites that are proposing a non-residential use and are adjacent to non-residential zones, the minimum setback is 0’. 3. We have multiple different storage uses – Personal Storage and Commercial Storage. Based on a correspondence forwarded to me regarding height limitations for personal storage in the C-1 zone, I assuming the use is personal storage. The site data table provided says the proposed use is Commercial – Storage, on the Development Package the use must be listed per the UDC. Also include the use specific standards code location (i.e. the proposed use is Personal Storage and is subject to Use Specific Standards 4.9.10.C.3 & .6) 4. 24’ is the minimum width of a 2-way PAAL, so the proposed access lane at the north of the property will need to be one-way. On the development package identify the circulation (Table 7.4.6-2). 5. The parcel lines appear to include the storage site and the Panera Bread restaurant, is a lot combination proposed? 6. Crosswalk access at pass through entrance/exit will be required. 7. Pedestrian access will be required to all adjacent ROWs. 8. The minimum vehicle clearance is 15’ for the vehicle pass through. 9. Access aisles cannot cross behind a parking space. The access aisle leading from the van ADA space at the southwest of the property appears to be in compliance, but make sure this requirement is met on the final configuration. 10. Heights of greater than 16’ are not allowed, this site must be rezoned to be approvable. 11. The rezoning process must be in finished prior to the issuance of a development package. Once your development package is issued your building permit can be issued. All applications can be submitted at risk at any time. 12. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932. |
02/18/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 2/18/21 1. There is an existing 8" CA water main (PN 086-1977) in the existing 15' public utility easements on the east and south side of proposed building. There also happens to be a couple private fire services that will need to be removed from the proposed site. 2. Currently there is a 2" service and 1 ½" service to the east of proposed building. Should you need to resize the meters or if there is a need for additional fire protection/fire services please contact Tucson Water's New Services section by sending an e-mail to TW_COMMON@tucsonaz.gov to discuss any other needs necessary. Any questions, comments or concerns about this project may be directed to: Fabien Elenes, Engineering Associate Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2202, Fabien.Elenes@tucsonaz.gov |