Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM09794
Parcel: 107031470

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM09794
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments
01/12/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/12/2022 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T21CM09794
2445 N Huachuca Dr – I-1
TI Office w/Exterior Work (1st Review)

TRANSMITTAL DATE: January 12, 2022

This site is located in I-1 zone (4.7.29), Administrivia Office is an allowed use in the zone (Table 4.8-5) subject to Use Specific Standard 4.9.13.Q.

1. As exterior work to the site is proposed, fence, gates, exterior gym per UDC Article 3.3.3.G.2.c a new site plan, Development Package (DP), is required to be submitted and approved prior to approval of this building permit. The DP shall meet the requirements of the checklist for Minor Changes to Commercial/Industrial Sites found at: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf. Zoning was not able to find an approved DP showing the shade structures. The DP is a separate submitted from the building plan and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using Submission Type “Site Review”.

If you have any questions about this transmittal, please contact Elisa Hamblin at ElisaHamblin@tucsonaz.gov.
01/12/2022 ROBERT SHERRY WATER REVIEW Completed
01/18/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM09794


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Beam Sizes for both canopies on the South side of the building.
2. The Structural Calculations provided shows a Footing F3, 4 Ft Sq and 12” thick. Verify and locate the footing on plan.
3. The Structural Calculations show Canopy Brace of TS4x4x1/2. Locate the Brace on Drawings and call the size.
4. Provide protection for the Canopy Steel which is exposed to weather. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection.
5. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed.
6. Verify OSHA steel erection standards for open web steel joists. Section 1926.757 (a)(8) requires connections of individual steel joists to steel structures in bays of 40 feet or more shall be fabricated to allow for field bolting during erection.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.

BUILDING REVIEW COMMENTS:
Denied
1. Under the general building summary the occupant class is listed incorrectly. It is listed as an I-1 and not a S-1. Please correct.
2. The building sq. ft. is listed differently in various locations. Provide the correct sq. ft. in applicable locations and correlate any requirements.
3. The occupant loads are calculated differently in various locations. Provide a correct occupant load calculation and correlate any requirements.
4. Door 101A is swinging in the incorrect direction. Correct the door swing in compliance with Section 1010.1.2.1.
5. Egress is not permitted through intervening spaces such as storage rooms in accordance with Section 1016.2 #5. Egress is traveling from the office through the storage space.
6. Provide evidence that the ceiling finishes are in compliance with Section 803. Provide manufacture specifications for the wood slat ceiling finish.

MECHANICAL REVIEW COMMENTS:
Denied
1. Range hood in in breakroom shall exhaust to the outdoors (IMC2018,505.4)
2. where appliances are located over 16' a permanent means of access shall be provided in an approved manner (IMC2018,306.5)

ELECTRICAL REVIEW COMMENTS
Approved

PLUMBING REVIEW COMMENTS:
Denied
1). Add gutter and downspout sizing calculations to Plan Pg. A4.0, that derive from -IPC 1106.1, 1106.3, 1106.6
2). Hose bibs on P1.0 need individual shut off valves. -IPC 606.2
3). Lavatory faucets on plan pg P4.0 need to comply with Tucson amendment -IPC 419.6 Automatic faucets.
4). Add an ASSE 1022 or 1024 backflow to ice maker connection on plan page P3.0 & P4.0 -IPC 608.17.1.2
5). Add water heater exhaust/intake routing and termination locations to plumbing pages. -IFGC A106.3.1
6). Add Gas firebox unit information to plan pages P2.0 or P3.0 such as manufacturer name , model number. IFGC A106.31 , IFGC Chapter 6, 602.1 thru 602.7.1 ( if these are vented fire boxes show vent routing & termination as well)
7). Add the type of Gas appliance to be installed in the fire box to plan pg. P2.0 or P3.0. manufacturer, name model number. IFGC A106.3.1 IFGC 602.1 thru 602.7.1
8). Provide combustion air information to the Plumbing pages for the fireplace rooms. -IFGC 304.1 621.5
9). Water to the floor drain trap primers in restrooms A115, A114 on plan p1.0 & P2.0 needs to be illustrated. -IPC A106.3.1, 1002.4.1
02/25/2022 JPEELDA1 FIRE REVIEW Reqs Change Denied
1. Under the general building summary the occupant class is listed incorrectly. It is listed as an I-1 and not a S-1. Please correct.
2. The building sq. ft. is listed differently in various locations. Provide the correct sq. ft. in applicable locations and correlate any requirements.
3. The occupant loads are calculated differently in various locations. Provide a correct occupant load calculation and correlate any requirements.
4. Door 101A is swinging in the incorrect direction. Correct the door swing in compliance with Section 1010.1.2.1.
5. Egress is not permitted through intervening spaces such as storage rooms in accordance with Section 1016.2 #5. Egress is traveling from the office through the storage space.
6. Provide egress plann with travel distance

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033

Final Status

Task End Date Reviewer's Name Type of Review Description
02/25/2022 VVERA1 OUT TO CUSTOMER Completed