Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW - COMMERCIAL
Permit Number - T21CM07236
Review Name: 3RD PARTY REVIEW - COMMERCIAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07236 1121 S 11th Ave Multifamily – C-3 TRANSMITTAL: September 23, 2021 This site is located in the C-3 zone (UDC 4.7.22). Multifamily is a permitted use in this zone (Table 4.8-4). 1. Zoning as reviewed the building plans for compliance with development package, DP21-0005, and although the building plans match the DP until the DP is approved by all PDSD review agencies Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
09/23/2021 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
09/23/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service to the building including the size of the water meter and backflow preventer and the material used for the water service pipe. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. 2. The development plan called for the installation of a 1-inch water meter. Tucson Water limits a 1-inch meter to a maximum demand of 50 GPM. Provide a letter from Tucson Water confirming that the use of a 1-inch water meter will be allowed for this project. |
10/15/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
10/27/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Building Plans show a 4 story but might fall under the mezzanine. Therefore the ladder to the roof might not be required. Please refelect on plans 4 story and or 2 with mezzanine. Questions: Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Jennifer Peel-Davis |
11/15/2021 | WILDAN | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Completed | |
11/15/2021 | DBENOIT1 | 3RD PARTY REVIEW-COMMERCIAL | AT 3RD PARTY OFFICE | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/15/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |