Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM06468
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/16/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM06468 2900 N Craycroft Rd Ft Lowell Park – Pool House Renovation, demo of kids pool and add splash pad and shade sail. TRANSMITTAL: August 16, 2022 COMMENTS: the following comments are relative to an application for Historic Review (UDC 5.8.8). This site is located in the HRX-2 zone (UDC 4.7.7). 1. Zoning acknowledges the submittal of DP22-0235 but until the DP is approved by all review agencies Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov |
| 08/16/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Approv-Cond | Activity Number: T21CM06468 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved 1. Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Conditionally Approved Third Plumbing Review: OK SUBJECT TO FIELD INSPECTIONS , SEE UPLOADED BUILDING OFFICIAL LETTER 1).OK 2). OK **COMPLIED PER UPLOADED BUILDING OFFICAL LETTER**-These trench drains in the open air locker room don't comply with sanitary system or storm system code requirements. Will need a letter of approval from the local authority that governs storm system drainage. These trench drains will be used to clean floors of the locker room area which is liquid waste by IPC definition which is not allowed to enter the storm system, that being said the open air would cause storm water to enter sewer if they were connected to sanitary. -IPC 301.3, 1101.3, 1104.2 3). OK 4). OK 5).OK 6). OK 7). OK 8). OK 9). OK-Does the splash pad have potable water connection? if yes show the RPZ backflow protection on the plumbing plans. -IPC 608.1 **PER Comment response splashpad water connection is existing, Field verify backflow protection at inspections** 10). OK 11). **OK USING A118.10 SHEET APPLIED WATERPROOFING MENBRANE PER RESPONSE COMMENTS**- Add shower lining material type to be used to plan page 17. --IPC 421.5.2 ** Response Comment stated prefabricated receptors being used, that doesn't correlate with plans** 12). OK **COMPLIED PER UPLOADED BUILDING OFFICAL LETTER**-Updated plan page 16 now shows drinking fountain discharging to a perforated drain piping that discharges to subsoil, that doesn't comply with -IPC 301.3 & IPC WASTE definition -The discharge from any fixture, appliance, area , appurtenance that doesn't contain fecal matter. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 08/16/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning comments |