Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM06053
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/03/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
08/04/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
09/22/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
09/22/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/22/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/22/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
09/22/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The new developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018. 2. Provide a cleanout for the new 3-inch horizontal drain serving the new hand sink and floor drain; the cleanouts shall be sized per Section 708.1.7, IPC 2018 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.1.1 and 708.1.8, IPC 2018. 3. Verify if an existing grease interceptor is currently in place to prevent the discharge of fats, oil, and grease into the public sewer. If a grease interceptor is not in place, show how the public sewer is to be protected from harmful discharges. Reference: Section 1003.1, IPC 2018. |
09/22/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
09/27/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed |