Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM04901
Parcel: 140390420

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T21CM04901
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/10/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM04901

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Approved
BUILDING REVIEW COMMENTS:
Approved

MECHANICAL REVIEW COMMENTS:
Denied
1. Correction complied
2.Correction not complied
3. Correction complied
4. Correction complied
5. Provide CO2 detectors and alarms or ventilation where CO2 is stored or dispensed in access of 100 lbs. (IFC2018,5307).

ELECTRICAL REVIEW COMMENTS
Denied
E5.1: Detail A2 One line Diagram's grounding calls out for #2/0 Copper and to reference Detail C3 on same sheet. Detail C3 Note #2 is not in agreement for conductor to grounding rod shown by Detail A2. Correct.

PLUMBING REVIEW COMMENTS:
Approved
08/18/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM04901
5050 E Valencia Rd
New Whataburger (2nd Review)

TRANSMITTAL: August 18, 2021
This site is located in the C-2 zone (UDC 4.7.22). Food Service is a permitted use in this zone (Table 4.8-4). See Use Specific Standards 4.9.4.M.1 and 4.9.13.P.

1. Zoning has reviewed the building plans for compliance with DP21-0172 and although it appears that the building matches what is shown on the DP, until DP21-0172 is approved Zoning cannot approve the building plan.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.
09/08/2021 SBLOOD1 ENGINEERING REVIEW Reqs Change The DP needs to be approved before the building plans can be approved.