Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM04277
Parcel: 114540540

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM04277
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/20/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2018.
2. Clarify the connection of the washer box drain to the existing building drain (e.g. provide a riser diagram). Reference: Sections 406.2, 708.1.1, and 911.3, IPC 2018.
3. Provide calculations showing how the water supply piping has been sized. Verify that the pipe sizes called out will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). Reference: Sections 604.1 and 604.3, IPC 2018
4. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.
05/20/2021 ROBERT SHERRY WATER REVIEW Reqs Change 1. Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter (i.e. the total demand for the building). Reference: Section 107.2.1, IBC 2018.
2. Show the location of the proposed water meter, backflow preventer, and the location and size of the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
05/20/2021 JPEELDA1 FIRE REVIEW Approved
05/26/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. The 2018 International Mechanical Code with Local Amendments is the relevant code for this project and this project is under the jurisdiction of the City of Tucson, not Oro Valley (see item #4, Mechanical General Notes).
2. Is the “existing Trane model #WSC060 – 5-ton unit” part of this activity?
3. State the required outside air flowrates for RTU-1 and RTU-2. Reference: Section 107.2.1, IBC 2018.
4. Clarify the location of the time clock for EF-1 (i.e. where is the warehouse?).
06/03/2021 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/03/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet X1: There is no note indicating the requirement of the IBC Section 2902.5 for a drinking fountain. Please indicate on the drawings.
2. Sheet X1; Reference Floor Plan: Is the valuation for the deferred submittal (pergola) included in the $50,000? Please verify.
3. Sheet A1; Wall Types: Please add a reference to 3/D1 to the Wall Types for the lateral wall bracing.
4. Sheet A2; Toilet Plan Keynotes: Note 16 indicates a 30"x48" accessible clearance at the shower. Per the ICC/ANSI Figure 608.2.1, the clear space must be 36"x48". Please verify.
5. Sheet A2; Toilet and Shower Plan: Please indicate the grab bars in the shower as required by the ICC/ANSI Figure 608.3.1. Add reference 4/D1 to the plan for those grab bars.
6. General: Please provide written responses to all review comments.
06/09/2021 LSHAMIS1 ZONING REVIEW Approved
06/16/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.

Revise the branch circuits for the outlets in the breakroom to correlate with the panel schedules.

Provide complete panel schedules include load calculations. Are the panels new or existing? If new, provide a complete electrical line diagram. 1 or 3 phase? Etc. Please identify as such.

Provide compliance with the 2018 IECC and required controls for the lighting.

Provide a luminaire schedule.

Provide wiring methods prescribed by NEC 517.13 for the branch circuits if applicable for the patient care areas. See NEC 517.13 for clarification of ‘Patient Care Areas’.

Locate the Water Heater and AC unit on the power plan. New or Existing?

Ref; 2018 IBC sec 107.2.1, 2017 NEC, City of Tucson Commercial Permit/Plan Submittal Requirements.
06/18/2021 SBLOOD1 ENGINEERING REVIEW Passed