Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel114540540
JurisdictionTucson, Pima County
City of Tucson ZoningO-3
Tucson WardWard 2
Tucson Registered NeighborhoodBear Canyon
Major Street & Route

Scenic Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 8700 E TANQUE VERDE RD
Date - 12/09/2025 6:56 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-84-32 Tanque Verde - Wrightstown 5962 6090

Rezoning Cases

Date - 12/09/2025 6:56 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-22-10 Casita Village - Tanque Verde R-2 Withdrawn 10/11/2022

Permits

Address: 8700 E TANQUE VERDE RD
Date - 12/09/2025 6:56 a.m.
Total Number Of Permits - (7)
Permit Status Apply Date Expired Date Unit Type Description
D98-0081 Approved 12/28/1998 N/A Development Package TANQUE VERDE OFFICE BUILDING
TE-FPU-1124-00400 Issued 11/18/2024 04/08/2025 Floodplain Use Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd.
TR-PIA-1124-00020 Submitted - Online 11/18/2024 N/A Private Improvement Agreement (PIA) Primary scope of work includes installing 3740 of new 8in sewer line along the south side of E. Tanque Verde Rd. with a full road crossing from north to south at each the maximum west end of the project and maximum east end of the project. PIA work includes the removal and eventual replanting of trees within COT ROW, and the replacing of median curb and landscape due to excavation crossing E. Tanque Verde Rd. from north to south in two locations.
TR-UTL-1124-02182 Complete 11/18/2024 04/08/2025 Right-of-Way (ROW) - Utility Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed 05/05/2025 DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK.
DP16-0143 Issued 08/17/2016 10/31/2026 Development Package CANOPY AND CARPORT
TE-FPU-0425-00175 Issued 04/29/2025 08/11/2025 Floodplain Use PLEASE REFERENCE PERMIT TR-UTL-1124-02182 and TE-FPU-1124-00400. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd.
TR-UTL-0425-00709 Complete 04/29/2025 08/11/2025 Right-of-Way (ROW) - Utility PLEASE REFERENCE PERMIT TR-UTL-1124-02182. Permit was approved and issued but work did not begin in allotted time frame. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 6am to 2pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed

Code Enforcement

Address: 8700 E TANQUE VERDE RD
Date - 12/09/2025 6:56 a.m.
Total Number Of Code Cases - (1)
Case Number Case Status Entered Date Exp Date Unit Type Description
CE-VIO0523-03690 Closed - Unfounded 05/23/2023 05/25/2023 WEEDS / Referred from ES / Failure to respond to Weeds Protocol address still in violation/ Excessive Weeds

Plans

Address: 8700 E TANQUE VERDE RD
Date - 12/09/2025 6:56 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T05BA00123 Approved 06/27/2005 N/A -- Stormwater Basin

Record Requests

Address: 8700 E TANQUE VERDE RD
Date - 12/09/2025 6:56 a.m.
Total Number Of Requests - (3)
Request Number Status Request Date Completed Date Type Description
REQ-0125-00439 Withdrawn 01/17/2025 N/A Requests Primary scope of work includes installing 3740 of new 8in sewer line along the south side of E. Tanque Verde Rd. with a full road crossing from north to south at each the maximum west end of the project and maximum east end of the project. PIA work includes the removal and eventual replanting of trees within COT ROW, and the replacing of median curb and landscape due to excavation crossing E. Tanque Verde Rd. from north to south in two locations. PER TDC Reviewer, permit has already been obtained through the GC for this project. Please withdraw permit.
REQ-0525-03132 Complete 05/05/2025 05/05/2025 Requests DENIED – DUE TO THE APPLICANT APPLYING AFTER THE EXPIRATION DATE. APPLY FOR NEW PERMIT TO CONTINUE WORK. Work under permit did not begin before the permit had expired. Per new permit application review comments, this permit to be renewed as opposed to issuing a new permit. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd. -Workdays - Monday through Friday -Work Hours - 7am to 3pm -Work Duration - 3 months (Crossings to take 2 weeks each including patchback of asphalt) (Remainder of work on south side of E. Tanque Verde Rd. to take 2 months) -Work on south side of E. Tanque Verde Rd. to primarily use shoulder/bike lane closures as shown in TCP, right lane closure to be used only if necessary -Work crossing from north to south on both the maximum west and east ends of the project to use a combination of a right lane closure then a "football setup" to completes the crossing in a 4-step process (right lane closure for southern east bound lane, "football" for northern east bound lane the median and the southern west bound lane, right lane closure for northern west bound lane) -Nights/Variable hours of work for major crossing can be accepted in order to comply with COTDOT needs if needed
REQ-0525-03134 Denied 05/05/2025 N/A Requests Work under FP Permit and main ROW Permit did not begin before permits expired. Per new permit request review comments, permit to be requested to be renwed/extended as opposed to issuing a new permit. Public sewer improvements. Installing 3,740lf of new sewer line and manholes along the south side of E. Tanque Verde Rd. with two sections crossing the road from the North side of E. Tanque Verde Rd. to South side of E. Tanque Verde Rd.