Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T21CM02091
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/15/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 03/23/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A101: Please provide a Code Analysis for Building 5 on this sheet, indicating the Occupancy Classification, Building SF, Construction Type, and Occupant Load (this may be a U classification and have no occupoant load). 2. Sheet A101; General Notes: Note 5 references Sheet A700 for Wall Types. Please revise that reference. 3. Sheet A101 (Floor Plan); Sheet A701 (Door Schedule): Doors 13, 14, and 15 at the Booths need to have Door Numbers indicated on the plan. 4. Sheet A701; Door Schedule: The Door Schedule is titled for the Cultural Kitchen. Please revise. 5. Sheet A701; Door Schedule: A Door #8 is indicated in this schedule. On what drawing is that door shown? 6. General: Please provide written responses to all review comments. |
| 03/23/2021 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/24/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the civil site plan referenced on sheet P101 showing the location of the water meter, reduced pressure backflow assembly and the route of the water service to the building. Specify the material of construction for the water service pipe. Reference: Section 107.2.1, IBC 2018. 2. Provide the civil site plan referenced on sheet P101 showing the route of the building sewer to the public sewer. Reference: Section 107.2.1, IBC 2018. 3. Coordinate the cricket layout and slope with the locations of the primary scuppers. 4. Provide the dimensions of the primary scuppers and downspouts. Reference: Section 1106.5, IPC 2018. 5. Provide secondary (overflow) roof drainage. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018. |
| 03/24/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Public restrooms require mechanical exhaust. Provide a minimum exhaust flow rate of 50 CFM per water closet or urinal if the exhaust is continuous, 70 CFM if the exhaust is intermittent. Reference: Section 403.3.1.1 and Table 403.3.1.1, footnote g, IMC 2018. |
| 03/24/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/01/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. #1. Provide plans and evidence on the plans that the proposed exterior lighting fully complies with the Outdoor Lighting Code. See section 104 for plan submittal requirements. Provide lighting plans with the following information on the plans; (a) Provide a complete luminaire schedule for each parcel, if more that one, include for each separate parcel. Include shielding and lamp color output temperature. (b) Size of the parcel in acres. It appears there are several parcels. If true, then provide total lumen calculations and all other required information for each parcel, per section 104.2.1. (c)See table 401.1, lighting area and option and indicate this information in the lighting site plan for each parcel, also show the locations and types of all exterior luminaires including existing. (d) Section 402.1 (light source color temperature requirements 3500K), shielding requirements, etc . (e) Provide a complete inventory (quantities) for each type of luminaire on the parcel. (f) Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. (g) Specify any exceptions used. (h) Curfew lighting controls If applicable. Do not confuse the Outdoor Lighting Code with the IECC. #2. Provide compliance with the 2018 IECC for lighting. #3. Indicate conduit, conductor sizes and types for the panel feeders on the line diagram. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2012 Tucson/Pima County Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements |
| 04/08/2021 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
| 04/09/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/13/2021 | IMONSHI1 | OUT TO CUSTOMER | Completed |