Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM01954
Parcel: 10607007A

Address:
1025 W PRINCE RD

Review Status: Completed

Review Details: COMMERCIAL - NEW

Permit Number - T21CM01954
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/15/2021 JPEELDA1 FIRE REVIEW Approved
03/24/2021 ROBERT SHERRY WATER REVIEW Completed
04/01/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM01954

GENERAL:
o Provide written responses to all review comments.
o Provide a complete plan set.
o Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied Reason: Date Completed : 4/27/2021 8:35:23 AM 1. Provide Structural Calculations for Foundations, Columns and Roof Framing per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 2. Provide Wind Load Calculations for the Building per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 3. Provide Seismic Calculations for the Building per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 5. Provide Geotechnical Report for the proposed building per International Building Code 2018. Geotechnical Report is not provided. 7. Verify if enough Shear Walls have been provided. I noticed Shear Walls SW3, SW4 and SW5 on one corner of the building. Verify Center of Rigidity, to counter Lateral Loads, of the Building and Center of Loading causing any Rotational issues for the Building along vertical axis. Submit response. 8. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 9. Roof drainage and secondary drains are to comply with IBC. NOTE: Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.
BUILDING REVIEW COMMENTS:
BUILDING REVIEW COMMENTS:
APPROVED

ELECTRICAL REVIEW COMMENTS
Approval Pending
Reason:
1. E2.2 Monument sign bypassed contacts in lighting contactor. ls this the design intent?

MECHANICAL REVIEW COMMENTS:
Denied
Reason:
Date Completed : 3/30/2021
1- Provide ventilation rate calculation and control system for Apparatus Bay to comply with IMC-404.1
2- Show on plans KEF-1 shall discharge 40" above roof surface. IMC-506.3.13.1. Also, show 10' horizontally to any intake to the building.
3- Provide energy calculations as per IECC-C401.2
4- Provide kitchen and building air balance, as per IMC-508.1.2

PLUMBING REVIEW COMMENTS:
Denied
Reason:
Date Completed : 3/30/2021
1- Provide energy calculations as per IECC-C401.2
2- Provide clothes washer with discharge interceptor. IPC-1003.6
3- Provide grease interceptor for all plumbing fixture and equipment with grease-laden waste, at food preparation area. IPC- 1003.3
4- Provide GWH-1/2/3 with temperature limiting means as per IPC-607.1.1 and set maximum temperature (F). Where listed TMB1 valve will be installed? Show it on plans.
04/06/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM01954
1025 W Prince Rd
Protective Service

TRANSMITTAL: April 6, 2021
This site is located in the C-1 zone (UDC 4.7.20). Protective Service is a permitted use in this zone (Table 4.8-4).

1. Zoning has reviewed the building plans for compliance with DP21-0018 and although the building plans appear to match the DP until the DP is approved Zoning cannot approve the building plans.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.
04/09/2021 LOREN MAKUS ENGINEERING REVIEW Reqs Change DEVELOPMENT PACKAGE MUST BE APPROVED FIRST.
04/19/2021 JGARCIA1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/20/2021 IMONSHI1 OUT TO CUSTOMER Completed