Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T21CM01954
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/15/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 03/24/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 04/01/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM01954 GENERAL: o Provide written responses to all review comments. o Provide a complete plan set. o Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied Reason: Date Completed : 4/27/2021 8:35:23 AM 1. Provide Structural Calculations for Foundations, Columns and Roof Framing per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 2. Provide Wind Load Calculations for the Building per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 3. Provide Seismic Calculations for the Building per International Building Code 2018. The calculations submitted contains blank pages. Submit complete set of calculations which I can review. 5. Provide Geotechnical Report for the proposed building per International Building Code 2018. Geotechnical Report is not provided. 7. Verify if enough Shear Walls have been provided. I noticed Shear Walls SW3, SW4 and SW5 on one corner of the building. Verify Center of Rigidity, to counter Lateral Loads, of the Building and Center of Loading causing any Rotational issues for the Building along vertical axis. Submit response. 8. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 9. Roof drainage and secondary drains are to comply with IBC. NOTE: Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: BUILDING REVIEW COMMENTS: APPROVED ELECTRICAL REVIEW COMMENTS Approval Pending Reason: 1. E2.2 Monument sign bypassed contacts in lighting contactor. ls this the design intent? MECHANICAL REVIEW COMMENTS: Denied Reason: Date Completed : 3/30/2021 1- Provide ventilation rate calculation and control system for Apparatus Bay to comply with IMC-404.1 2- Show on plans KEF-1 shall discharge 40" above roof surface. IMC-506.3.13.1. Also, show 10' horizontally to any intake to the building. 3- Provide energy calculations as per IECC-C401.2 4- Provide kitchen and building air balance, as per IMC-508.1.2 PLUMBING REVIEW COMMENTS: Denied Reason: Date Completed : 3/30/2021 1- Provide energy calculations as per IECC-C401.2 2- Provide clothes washer with discharge interceptor. IPC-1003.6 3- Provide grease interceptor for all plumbing fixture and equipment with grease-laden waste, at food preparation area. IPC- 1003.3 4- Provide GWH-1/2/3 with temperature limiting means as per IPC-607.1.1 and set maximum temperature (F). Where listed TMB1 valve will be installed? Show it on plans. |
| 04/06/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM01954 1025 W Prince Rd Protective Service TRANSMITTAL: April 6, 2021 This site is located in the C-1 zone (UDC 4.7.20). Protective Service is a permitted use in this zone (Table 4.8-4). 1. Zoning has reviewed the building plans for compliance with DP21-0018 and although the building plans appear to match the DP until the DP is approved Zoning cannot approve the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 04/09/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | DEVELOPMENT PACKAGE MUST BE APPROVED FIRST. |
| 04/19/2021 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/20/2021 | IMONSHI1 | OUT TO CUSTOMER | Completed |