03/16/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Page 1 (Site Plan); Page 8 (South Elevation): Per a Code Interpretation by the Building Official on 4-17-2014, a Group U structure can be erected without any fire resistive rating if the vertical structural supports have a fire separation distance of at least 5' and the roof projection has a fire separation distance of at least 2' from an existing structure or property line. Please indicate on the Site Plan and on the South Elevation that those clearances are met for the new solar structure to the existing building. If those clearance requirements can not be met, the requirements of the IBC Section 508.2.3 for Accessory Occupancy Allowable Building Area must be met and indicated on the drawings.
2. Page 1; Code: Please remove the 2018 IRC.
3. Page 6: Please indicate the material strengths and specifications for the C-Channel purlins, structural steel beams and columns, concrete, and the TEK screws on the drawings.
4. Page 6; Plan Layout; Section A: The Plan and Section indicate the roof beams to be 3"x3"x1/4 Gauge. Please revise the 1/4 Gauge to 1/4".
5. General: On the drawings, indicate a Code Analysis for applicable design loads, Occupancy Classification of this structure, structure SF, and Construction Type.
6. General: Please provide written responses to all review comments.
03/16/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.

Provide a grounding detail showing structural steel and racking grounding in compliance with NEC 690.43 A,B.
03/31/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM01616
1038 E Fort Lowell

TRANSMITTAL: March 31, 2021
This site is located in the O-3 zone.

1. As this is a commercial site a Development Package (DP), commercial site plan, is required to be submitted and approved prior to approval of the building plans. At a minimum the DP must meet the requirements of the Checklist for Minor Development Changes to Existing Commercial/Industrial Sites found at: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf.
The DP is a separate submittal from the building plans and must be submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Under “Submission Type*” “Site Review”
Until the DP is approved Zoning cannot approve the building plans.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov
03/31/2021 SSHIELD1 ENGINEERING REVIEW Reqs Change This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Instructions:
1. Is this for a new or existing activity application? - Please select New Application.

2. Submission Type - Select Floodplain Use Permit.

3. Project Name - Enter a name for your project.

4. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided.

5. Type of Permit - Select Commercial or Residential (Residential is for work on single family residences and duplexes.)

6. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account.