Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM01253
Parcel: 13315305A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM01253
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2021 JPEELDA1 FIRE REVIEW Approved
03/11/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM01250, T21CM01251, T21CM01252, & T21CM01253
2200 N Camino Principal
Convert Restaurant to Residential Care

TRANSMITTAL: February 11, 2021
This site is located in the C-1 zone (UDC 4.7.20). Administrative and Professional Office is a permitted use in this zone (Table 4.8-4) Subject to Use Specific Standard 4.9.7.J.1, 3.d, .4, .6, & .8 and 4.9.13.O.

1. Zoning has reviewed the building plans but cannot approve until Development Package DP21-0041 has been approved Zoning cannot approved the building plans.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.
03/11/2021 ROBERT SHERRY WATER REVIEW Completed
03/22/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM01250-1253
GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied
1) S1.1 Design Loads/Seismic Load ; The spectral response acceleration parameter SD 1 has different value used in the
calculations page 57. this will not effect the end result but should match to calculations.
2) list of the load combinations are used in the design and identify any design software used in lateral framing analysis.
3) Provide summary of cumulative drifts from wind forces for the nand ew 2-story building B. Demonstrate that serviceability
limit of H /400 is not exceeded.
4)Provide C&C wind design uplifts for roofing attachment based on zones and tributary area of 10 sq.ft. List also C&C roof
trusses base on their tributary area. Please post these pressures in the general notes or in S1.4 drawing.
5) S2.1 ; Please label the floor slab at foundation plan for building "A" as existing like you have indicated the walls as
existing. Verify that the shear walls are also existing or new. If they are new please label them.
6) S2.2 At Roof Framing plan label the roof trusses are existing describe the extend of repair, replacement scope of work
including metal standing seam roof.
7) S3.1: F2 &F3 footings appears that they are overlapping each other. Please provide a detail with reinforcing.
8) S3.1; Key note 2 depicts 4 inch concrete slab. please provide reinforcing information and maximum spacing of saw cut
joints.
9) S4.1: Label the existing slab and footings. At couple locations there are Hold down anchor marks. Are these at only
specific locations or typical.
10) S4.3: There are shear walls label them unless they are existing and not modified walls.
11) S6.1: See detail 112; there is a 32" wide wall footing . which is missing in footing schedule.
12) S6.2: Detail 125 ; Specify the extension length of new footing under new Steel column.
13) S6.2 ; Detail 127: Identify the new footing size on the foundation plan @ S4.1
14) There are new roof top units. Please provide a wind design calculation for the anchorage of the units to roof framing as
per ASCE 7-16 / section 29.4.1
15) Please respond in writing.
BUILDING REVIEW COMMENTS:
Denied
1. Revise plans to indicate on Title Sheet in Project Code Check box occupancy group. IBC 107.1
2. Revise Title Sheet in Project Code Check box occupancy load calculation IBC 107.1
3. Revise plans to provide accessible plan for the following: IBC 1102.1, 1104.1, 1107.6.2, ANSI 117.1
• calculations for Type A and Type B units
• Note which units are accessible and provide details and specifications for accessible units
• Accessible routes details and specifications
• Accessible parking calculations, details, specifications and signage
• Accessibility details for elevator
4. Page A13.1 - There are four different wall sections all labeled WALL SECTION 6A, clarify
5. Page A10.0, Elevation A, Key note 8 & 9 regarding metal guard rails and handrails is referred to Page A13.1 details
8 & 9. Page A13.1 has no such notes. Clarify
6. Page S4.1, detail 15, 10, 9, 8, 7, 1 - Cannot read yellow printing, please make readable.
7. Revise plans to indicate Separation Wall construction details of UL U801 and 4230 Rated Wall Assembly on plan.
IBC 420.2
8. Revise plans to provide window schedule. IBC 107.1
9. Revise plans to show through penetration firestop system details for walls, floor/ceiling or roof/ceiling penetrations.
10. Revise plans to include finish classes of wall and ceiling finishes.
11. Revise plumbing to indicate automatic lavatory faucets as required by local ordinance 412.11 Automatic faucets.
New or replacement faucets serving lavatories in all buildings other than R3 occupancies, individual units in R2
occupancies, or International Residential Code structures shall be provided with automatic faucets in accordance with
419.6.
12. Revise electrical plan that show units that have two lavatory sinks to have electrical receptacle for each sink. NEC
210.52 (D)
13. Energy compliance forms for envelope and lighting are not completed and signed.
14. Page M-1.5 - Revise plans to indicate distance from mechanical unit to roof edge (less than 10 feet requires
guards per IBC 1015.9) working space and electrical 110 volt working receptacle.
15. Revise plans for new building A to indicate fire place details, new or existing and if new construction details. IBC
107.1
ELECTRICAL REVIEW COMMENTS
Denied
E-1: No Electrical Comments.
E-2: No Electrical Comments.
E-3: No Electrical Comments.
E-4: South East doorway missing switch. No information provided for exterior fixtures.
E-4.1: No GFCI receptacle shown in South East unit Bathroom. Receptacles on East outer wall do not have Circuit numbers
and need to be WP and GFCI.
E-4.2: Key Note 4 should probably read ‘STARTER’ instead of ‘STARTED’
E-5: No Electrical Comments.
E-5.1: Circuit detail not as extensive as other buildings.
E-5.2: No Electrical Comments.
E-6: No Electrical Comments.
E-6.1: No Electrical Comments.
E-6.2: No Electrical Comments.
E-7: Light switch for 1st floor plan middle bathroom on corner of vanity. Is this switch needed?
E-7.1: No electrical comments
E-7.2: No Electrical Comments.
E-8: No Electrical Comments.
E-8.1: No Electrical Comments.
E-8.2: No Electrical Comments.
E-9: Correct load summary values for Dist Brd ‘B’ and Elevator. Correct fault current calculations, obvious errors in ‘A’ and
Powered by Page 6
REVIEW DETAILS
SUBMITTAL # 1250-1253001.022521
Job Type: Master Plan
‘D’. Where was AFC of 75,100A obtained?
E-10: No Electrical Comments.
E-11: No Electrical Comments.
E-12: No Electrical Comments.
MECHANICAL REVIEW COMMENTS:
Mechanical comments
1. Size low/high opening (water heater) to allow air for combustion, as per section FMC-701.1
2. Provide detail of penetration of kitchen range exhaust duct penetrating and going up to roof cap inside fire rated
partition. FMC-(BF) 607.5.3
3. Provide detail to show how Condensing Units will be attached to building structure (upper/lower attachments) to support
wind and seismic load, if applicable. IMC-301.18 and 301.15
PLUMBING REVIEW COMMENTS:
Approved
03/31/2021 SBLOOD1 ENGINEERING REVIEW Reqs Change Engineering has reviewed the building plans for compliance with DP21-0041 and although the building plans appear to match the DP until the DP is approved Engineering cannot approve the building plans.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
04/26/2021 LBOWERS1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review