Permit Number: T21CM01039
Parcel: 11504475B

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM01039
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/25/2021 ROBERT SHERRY WATER REVIEW Completed
02/25/2021 DTRAMME1 ENGINEERING REVIEW Passed
02/25/2021 JPEELDA1 FIRE REVIEW Approved
03/08/2021 STEVE SHIELDS ZONING REVIEW Approved
03/22/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM01039

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
N/A
BUILDING REVIEW COMMENTS:
Approved
ELECTRICAL REVIEW COMMENTS
Requires Change
Electrical Requirements of electrical submittal per City of Tucson Checklist plus code compliance review:
• Electrical Plans
Fully dimensioned floor plan showing location and assigned circuit numbers of all outlets, luminaires, switches, appliances,
panels, motors, disconnects, electrical and HVAC equipment. All home runs should indicate panel name or number. A
Registered Electrical Engineer is required when electrical designs exceed 400 amps, and where the available fault current at
any new piece of equipment exceeds 22,000 amps, or for hazardous locations, hospitals or buildings with operating rooms.
• One Line Diagram
Include voltage and phase, Panel and/or transformer size, Feeder loads, rating breakers or fuses including A.I.C., Complete
fault current analysis and total tenant and building service load
• Panel Schedule
Include panel numbers, voltage, phasing, location, bus size, circuit number, breaker sizing, number of poles, A.I.C rating,
number of lights and/or receptacles by circuit, total KVA load.
• Fixture and Equipment Schedule
Include fixture by letter or symbol, number and wattage of lamps and total watts of fixture including ballast, type of lamp, type
of mounting
• Lighting and Outdoor Lighting Code
Compliance with the 2018 IECC for lightning and PC/COT Outdoor lightning code to include light budget calculations and
considerations
Comments by the 3rd party review:
Design documents fulfilled the above requirements.
E-0.1: No Electrical Comments.
E-1.0: No Electrical Comments.
E-1.1: No Electrical Comments.
Powered by Page 5
REVIEW DETAILS
SUBMITTAL # 1039001.022521
Job Type: Master Plan
E-2.0: No Electrical Comments.
E-3.0: No Electrical Comments.
E-3.1: No Electrical Comments.
E-4.0: EF1 is shown as 2 Hp, but Ampacity and Voltage imply ½ hp. Coordinate and correct where required.
E-4.1: No Electrical Comments.
E-5.0: No Electrical Comments.
E-6.0: No Electrical Comments.
E-6.1: No Electrical Comments.
E-7.0 HME INTERCOM SYSTEM KITCHEN: Listed on legend, but not in submittal. However, an intercom system would be
a low voltage system and not a real concern for NEC code violations.MECHANICAL REVIEW COMMENTS:
Mechanical
Review Status-Rejected
(*) Denote clarification to a no satisfied comment.
Mechanical comments
1. Provide shop drawings for Walk-in Coolers and Freezers or note on mechanical plans this information will be on the
deferred drawings, instead. IBC-(A) 110.1
2. Provide Energy Calculations as per IECC-C401.2. Provided Com-Check form on M5.0 Sheet seems to be none
applicable to this project.
3. Show on roof plans all HVAC equipment is installed at least 10’ from roof edge, or provide alternative to comply with
IMC-304.11
4. Show on floor plan-mechanical access panel dimensions for SF-1. IMC-306.1
5. Provide detail to show how Condensing Units and H/P will be attached to building structure to support wind and seismic
load. IMC-301.18 and 301.15
6. Show on Mezzanine Roof Plan how the HVAC equipment will be accessed. Please comply with IMC-311.4 and provide
a new permanent ladder if applicable. IMC-306.5
PLUMBING REVIEW COMMENTS:
Approved