Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T21CM00516
Parcel: 117121930

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM00516
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/19/2021 DTRAMME1 ENGINEERING REVIEW Passed
02/01/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Specify that all proposed plumbing fixtures shall be listed by a third-party certification agency as complying with the relevant standards. Reference: Section 303.4, IPC 2018.
02/01/2021 ROBERT SHERRY WATER REVIEW Completed
02/02/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Demonstrate energy code compliance for the building envelope using calculations based on the current code. Alterations of an existing, non-conditioned building space shall be brought into full compliance with the 2018 International Energy Conservation Code. Reference: Section C503.2, IECC 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.
3. Show that the proposed HVAC equipment meets the minimum performance requirements of Section C403.3.2, IECC 2018.
02/08/2021 JPEELDA1 FIRE REVIEW Approved
02/09/2021 STEVE SHIELDS ZONING REVIEW Approved
02/09/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
02/16/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet G0.2; First Floor Life Safety Plan: Per the IBC Section 1017.3, the exit access travel distance shall be measured along the natural and unobstructed path of horizontal and vertical egress travel. Please revise.
2. Sheet G0.2; First Floor Life Safety Plan: A stair is indicated at the south end of this space, providing access to a new loft area. Please verify the exit access travel distance from the loft to the exit door. In addition, indicate the occupant load of the loft area.
3. Sheet A1.0; First Floor Plan: The Toilet Room 106 references an enlarged plan 5/S2.0. Please revise that reference.
4. Sheet A1.0; First Floor Plan: All interior elevatiions and sections reference Sheet S2.0. Please revise that reference.
5. Sheet A1.0; Loft Floor Plan: Please provide structural calculations for the loft floor framing.
6. General: Please provide written responses to all review comments.
02/16/2021 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed