Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM09215
Parcel: 14042021A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20CM09215
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2021 LOREN MAKUS ENGINEERING REVIEW Approved
02/25/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
03/15/2021 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL
Nicholas Martell, Planner
T20CM09215
Shell Building
March 15, 2021

The Shell Building plans cannot be approved until the approval of DP20-0173.

If you have any questions about this transmittal, please contact me at Nicholas.Martell@tucsonaz.gov
03/15/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. A boxed note on the cover sheet (CVR1.0) notes that all of the civil sheets are included in the development plans. Again, an approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to the building, building sewer, site lighting, or electrical service to the building). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit. [Initial comment: An approved development plan is not to be used for construction or modification of on-site utilities (e.g. building sewers). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit.]
2. The controlling code for gas piping is the 2018 International Fuel Gas Code, not the 2018 International Plumbing Code. In addition, the support of gas piping is covered in Sections 407.2 and 415.1, IFGC 2018. [Initial comment: The controlling code for gas piping is the 2018 International Fuel Gas Code, not the 2018 Uniform Plumbing Code (see P5.1).]
3. Provide a full plan set with the next submittal.
03/21/2021 EHAMBLI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed