Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM07490
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/16/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide the missing mechanical plans. |
| 11/16/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide the missing plumbing plans. |
| 11/16/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the missing plumbing plans. |
| 11/19/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Define the AHJ on the cover sheet for fire alarm, fire sprinkler and fire final inspections. |
| 11/23/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/24/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheets G101 and G103; Project Data (Codes): Please revise the ICC/ANSI A117.1 to the 2009 Edition. 2. Sheet G103; Code Review: Please indicate the new SF added to the existing building. In addition, indicate the existing building SF, along with the total building SF. 3. Sheet A102; General Notes: Note 5 references Sheet A118 for Wall Types. Please revise that reference. 4. Sheet A102; New Floor Plan: Please indicate the Wall Types at the southwest portion of this building. In addition, indicate on the plan the use of this area. 5. Sheet A202; Reflected Ceiling Plan: Please indicate the exit sign fixtures on this plan. 6. General: The valuation needs to be revised. Please indicate the valuation for each permit separately. 7. General: Please provide written responses to all review comments. |
| 11/24/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/11/2020 | JGARCIA1 | ZONING | REVIEW | Needs Review | |
| 12/11/2020 | JGARCIA1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/11/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
| 12/11/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
| 12/11/2020 | JGARCIA1 | REJECT SHELF | Completed |