Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM06818
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/19/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/23/2020 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 10/28/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the mechanical design as required to avoid using the corridor as a return air duct from the file room to FC-2. Reference: Section 601.2, IMC 2018. 2. Secure the refrigerant circuit access ports of the condensing units to prevent unauthorized access. Reference: Section 1101.10, IMC 2018. 3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018. 4. Full compliance with the 2018 IECC for new buildings requires that an "additional efficiency package option" be selected per Section C406. Based on the envelope and mechanical COMcheck compliance certificates, the architect chose the reduced lighting power option. Apparently the electrical engineer was not informed of this decision. Revise the lighting design to comply with Section C406.3, IECC 2018 or select an alternate means of complying with the additional efficiency requirement. Reference: Section C401.2 (2), IECC 2018. |
| 10/28/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide specifications for the "plumbed water cooler" noted on sheet A1.0 (P6). The use of a point-of-use water dispenser in lieu of a drinking fountain requires the installation of a listed and labeled dispenser along with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34" and 48" above the finished floor. |
| 10/28/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/05/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 11/05/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet S1.0; Foundations (With Soil Report): These calculations indicate a soils report was used in the foundation design. Please provide that report for review. 2. Sheet S4.1; Detail 112: Please revise the detail notes as required. 3. General: Please provide a Special Inspection Certificate with Parts A and B completed. 4. General: Please provide written responses to all review comments. |
| 11/10/2020 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
| 11/12/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | This building will have a “fire-flow calculation area” of 4,000 sq feet(2018 IFC Appendix B, Section B102 and 105.1) 400 greater than 3,600 sq. ft.: therefore this building will require a sprinkler system unless the fire flow in the nearest hydrant is a minimum of 1,750 GPM for 2 hours duration at 20 psi residual pressure. Additionally, the hydrant must be within 400’ of all parts of the building. Contact Tucson Water Fred.Coy@Tucsonaz.gov engineering for a hydraulic analysis. Provide notes on plan regarding verification of fire flow and proximity of hydrant or intent to install a fire sprinkler system. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/12/2020 | KROBLES1 | OUT TO CUSTOMER | Completed |