Permit Number: T20CM06300
Parcel: 141114050

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20CM06300
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2022 ROBERT SHERRY WATER REVIEW Completed
01/03/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The drawing numbers in the sheet index are different from the numbers on the plumbing drawings and there are two drawings labeled P-2 and P-3. Coordinate the drawing numbers with the sheet index on sheet A-1.
2. Recalculate the allowable pressure loss calculation. With an allowable pressure loss for friction equal to 0.6 PSI and 225 equivalent pipe length, the pressure drop per 100 feet will be 0.27 PSI per 100 feet, not 17.96 PSI/ 100 feet. Have you considered a pressure booster system? Reference: Section 604.7, IPC 2018.
3. Where did the 60 GPM and 1.5 PSI/100 feet figures come from? Note that 60 GPM in a 1-1/2" Type M copper pipe flows at 10.5 FPS, not 4.5 FPS. The maximum water velocity in copper piping is 8 feet per second.
4. Installation of a cup dispenser along with a bottle filler as part of this activity is required unless a dual level drinking fountain is being installed. Provide specifications for the bottle filler. [Initial comment: A bottle filler is not acceptable as a substitution for a drinking fountain unless cups are available at an accessible location.]
5. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018.
01/04/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1 . Identify or provide the correct electrical line diagram that correlates with the electrical service and panel requirements for Building #7.

2. A lighting plan for building #7 was not submitted in this latest plan resubmittal.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, 2012 Tucson/Pima County outdoor Lighting Code.
01/04/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Revise the ventilation calculation spreadsheet by entering the number of water closets in each restroom rather than the room area, as noted in the instructions. Reference: Section 107.2.1, IBC 2018.
12/13/2021 JPEELDA1 FIRE REVIEW Approved
12/15/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved