Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM06299
Parcel: 141114050

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T20CM06299
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. The drawing numbers in the sheet index are different from the numbers on the plumbing drawings and there are two drawings labeled P-2 and P-3. Coordinate the drawing numbers with the sheet index on sheet A-1.
2. Recalculate the allowable pressure loss calculation. With an allowable pressure loss for friction equal to 0.6 PSI and 225 equivalent pipe length, the pressure drop per 100 feet will be 0.27 PSI per 100 feet, not 17.96 PSI/ 100 feet. Have you considered a pressure booster system? Reference: Section 604.7, IPC 2018.
3. Where did the 60 GPM and 1.5 PSI/100 feet figures come from? Note that 60 GPM in a 1-1/2" Type M copper pipe flows at 10.5 FPS, not 4.5 FPS. The maximum water velocity in copper piping is 8 feet per second.
4. Installation of a cup dispenser along with a bottle filler as part of this activity is required unless a dual level drinking fountain is being installed. Provide specifications for the bottle filler. [Initial comment: A bottle filler is not acceptable as a substitution for a drinking fountain unless cups are available at an accessible location.]
5. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018.
01/03/2022 ROBERT SHERRY WATER REVIEW Completed
01/04/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
01/04/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the ventilation calculation spreadsheet by entering the number of water closets in each restroom rather than the room area, as noted in the instructions. Reference: Section 107.2.1, IBC 2018.
2. Show how the required ventilation will be provided for the office. Reference: Section 401.2, IMC 2018.
3. Clarify the note, "1/2" coolant line from fan coil to air handler per mgf. specs." A fan coil unit is an air handler; are you referring to the fan coil unit and the condensing unit? Provide a condensate drain for the fan coil unit (AC-1). Reference: Section 107.2.1, IBC 2018.
4. Coordinate the COMcheck envelope components with the office construction (e.g. R-13 versus R-19 batt insulation in the walls; no insulation called out on the drawing for the office ceiling versus R-48 batt plus R-48 continuous insulation for the office ceiling in COMcheck).
5. The COMcheck mechanical compliance certificate calls for one split-system heat pump for each office/warehouse section of the building but keynote 1 and the mechanical plan call for two split-system heat pumps for each office/warehouse section of the building. Which is correct?
12/13/2021 JPEELDA1 FIRE REVIEW Approved
12/15/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved