Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM06292
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/01/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Please address the following issues: 1) Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. - Please advise the farthest side of each building length from the two hydrants. IFC 2018, 507.5.1 2) Buildings shall meet the fire flow requirements of Appendix B located in the 2018 IFC. Builidngs that are 6,000 sq feet and V-B construction shall have a fire flow of 2,000 gpm for 2 hours. Buildings that are 4,000 sq feet and V-B cxonstruction shall have a fire flow of 1,750 for 2 hours. The building that is 1,200 square feet needs to meet the hydrant requirements or be sprinklered. The other buildings shall meet both requirements. You may contact Fred Coy Fred.Coy@Tucsonaz.gov from Tucson Water to perform the fire sprinkler waterflow annalysis for each building. We will need a letter from Fred stating you meet the requirements or a modification on your plans that you are adding fire sprinkler systems to the building. If you have any questions you can contact me @ Jennifer.Peel-Davis@tucsonaz.gov |
| 10/01/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Provide plans and evidence on the plans that the proposed exterior lighting fully complies with the 2012 Tucson/Pima County Outdoor Lighting Code. See section 104 for plan submittal requirements. 2. Provide a lighting site plan with the following information on the plans; (a) Location and identifying mark for each exterior luminaire on the parcel including any existing lighting. (b) See table 401.1, lighting area and option and indicate on the plans. (c) Provide calcs for total lumens allowed and total lumens proposed per acre including existing, for Full Cut Off and Unshielded per table 401.1. (d) Indicate whether or not a special inspection is required per sec. 104.2.2, and 106.2. (e) Specify any exceptions used. (f) Curfew lighting controls If applicable. Do not confuse the Outdoor Lighting Code with the IECC. 3. Verify that there is a 120 GFI protected receptacle within 25' of mechanical equipment outside or on the roof for maintenance. NEC 210.63. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code |
| 10/08/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide drawings that only show the scope of the proposed shell construction. Reference: Section 107.2.1, IBC 2018. 2. Coordinate the drawing numbers with the sheet index on sheet A-1. 3. Building 12 is included on the drawings and calculations but it does not have an activity number. Obtain an activity number for building 12 or remove it from the drawing set. 4. Provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. |
| 10/08/2020 | MALLORY RESS | ZONING | REVIEW | Approved | |
| 10/08/2020 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018. |
| 10/12/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide drawings that only show the scope of the proposed shell construction. Reference: Section 107.2.1, IBC 2018 |
| 10/13/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-1; Site Plan: Please indicate a north arrow on this plan. 2. Sheet A-3.4; Floor Plan: This permit is for a Letter of Completion only (no occupant load established at this time). The IBC Tables 1006.2.1 and 1006.3.3(2) indicate the maximum allowable occupant load of 29 for spaces with one exit, or a maximum common path of egress travel distance of 75' for spaces with one exit. If either of these requirements are not met, two exits will be required (separated per the IBC Section 1007.1.1. 3. Sheet A-3.4; Floor Plan: Per the IBC Section 1016.2(3), an exit access shall not pass through a room that can be locked to prevent access. The single exit through the office space would not be allowed if the interior door can be locked (see Door Schedule). Please verify. 4. Sheet A-3.4; Occupancy Load Table: Please revise the exit requirements per the IBC Tables 1006.2.1 and 1006.3.3(2). 5. Sheet A-3.4; Minimum Plumbing Fixtures: Per the IBC Section 2902.2(2), if the total occupant load for a tenant space is 15 or less, a single restroom facility may be used. If the occupant load is greater than 15, separate facilities for males and females will be required. Please verify. 6. Sheet A-3.4; Floor Plan: The wall between the restrooms and the offices does not indicate a Wall Type. Please provide. 7. Sheet A-11; Accessible Mounting Heights: Please locate the vertical grab bar from the back wall per the ICC/ANSI Figure 604.5.1, and the vertical grab bar from the floor per the ICC/ANSI Figure 604.5.1. 8. Sheet A-11; Accessible Mounting Heights: Please indicate the maximum spout height for the accessible drinking fountain per the ICC/ANSI Figure 602.5. 9. General: Please verify the building separations meet the distance requirements of the IBC Sections 705.3 and 705.5. It appears from a Development Plan that some buildings do not meet those requirements, or the IBC Table 602 requirements. 10. General: Please provide a Special Inspection Certificate with Parts A and B completed. This form may be found at www.tucsonaz.gov/PDSD. 11. General: Please provide written responses to all review comments. |
| 10/13/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 10/27/2020 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
| 11/25/2020 | KROBLES1 | LANDFILL | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/25/2020 | KROBLES1 | OUT TO CUSTOMER | Completed |