Permit Number: T20CM06289
Parcel: 141114050

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20CM06289
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

Ref; Plan sheet LSP.

1 . The site lighting plan for the parcel shows 12 existing exterior ‘D’ type luminaires. The Outdoor Lighting Lumen Schedule shows only 9 existing ‘D’ luminaires. Please clarify .

2. Update the Outdoor Lighting Calculations to reflect any exterior lighting changes.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, 2012 Tucson/Pima County outdoor Lighting Code.
02/07/2022 DBENOIT1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
12/13/2021 JPEELDA1 FIRE REVIEW Approved
12/14/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
12/21/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Comment not resolved. The drawing numbers in the sheet index are different from the numbers on the plumbing drawings and there are two drawings labeled P-2 and P-3. [Initial comment: Coordinate the drawing numbers with the sheet index on sheet A-1.]
2. Revise the water isometric to clearly show how the hot water is being correctly supplied to the lavatory and the service sink. Reference: Section 607.4, IPC 2018 and Section 107.2.1, IBC 2018.
3. Verify that the distance from the hot water source to the lavatory complies with the requirements of Section C404.5, IECC 2018 (e.g. 24" for ½" pipe).
12/21/2021 ROBERT SHERRY WATER REVIEW Completed
12/21/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Revise the ventilation calculation spreadsheet by entering the number of water closets in each restroom rather than the room area, as noted in the instructions. Reference: Section 107.2.1, IBC 2018.
2. Show how the required ventilation will be provided for the office. Reference: Section 401.2, IMC 2018.
3. Clarify the note, "1/2" coolant line from fan coil to air handler per mgf. specs." A fan coil unit is an air handler; are you referring to the fan coil unit and the condensing unit? Provide a condensate drain for the fan coil unit (AC-1). Reference: Section 107.2.1, IBC 2018.
4. Coordinate the COMcheck envelope components with the office construction (e.g. R-13 versus R-19 batt insulation in the walls; no insulation called out on the drawing for the office ceiling versus R-48 batt plus R-48 continuous insulation for the office ceiling in COMcheck).

Final Status

Task End Date Reviewer's Name Type of Review Description
02/07/2022 DBENOIT1 APPROVAL SHELF Completed
02/07/2022 DBENOIT1 OUT TO CUSTOMER Completed
02/07/2022 DBENOIT1 REJECT SHELF Completed