Review Details: RESUBMITTAL
Permit Number - T20CM06289
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/03/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Ref; Plan sheet LSP. 1 . The site lighting plan for the parcel shows 12 existing exterior ‘D’ type luminaires. The Outdoor Lighting Lumen Schedule shows only 9 existing ‘D’ luminaires. Please clarify . 2. Update the Outdoor Lighting Calculations to reflect any exterior lighting changes. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, 2012 Tucson/Pima County outdoor Lighting Code. |
| 02/07/2022 | DBENOIT1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/13/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 12/14/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 12/21/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not resolved. The drawing numbers in the sheet index are different from the numbers on the plumbing drawings and there are two drawings labeled P-2 and P-3. [Initial comment: Coordinate the drawing numbers with the sheet index on sheet A-1.] 2. Revise the water isometric to clearly show how the hot water is being correctly supplied to the lavatory and the service sink. Reference: Section 607.4, IPC 2018 and Section 107.2.1, IBC 2018. 3. Verify that the distance from the hot water source to the lavatory complies with the requirements of Section C404.5, IECC 2018 (e.g. 24" for ½" pipe). |
| 12/21/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 12/21/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the ventilation calculation spreadsheet by entering the number of water closets in each restroom rather than the room area, as noted in the instructions. Reference: Section 107.2.1, IBC 2018. 2. Show how the required ventilation will be provided for the office. Reference: Section 401.2, IMC 2018. 3. Clarify the note, "1/2" coolant line from fan coil to air handler per mgf. specs." A fan coil unit is an air handler; are you referring to the fan coil unit and the condensing unit? Provide a condensate drain for the fan coil unit (AC-1). Reference: Section 107.2.1, IBC 2018. 4. Coordinate the COMcheck envelope components with the office construction (e.g. R-13 versus R-19 batt insulation in the walls; no insulation called out on the drawing for the office ceiling versus R-48 batt plus R-48 continuous insulation for the office ceiling in COMcheck). |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/07/2022 | DBENOIT1 | APPROVAL SHELF | Completed |
| 02/07/2022 | DBENOIT1 | OUT TO CUSTOMER | Completed |
| 02/07/2022 | DBENOIT1 | REJECT SHELF | Completed |