Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM04388
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/20/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 07/20/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the number of drinking fountains that complies with the requirements of Sections 2902.1and 2902.5, IBC 2018 and Section 410.3, IPC 2018. 2. Revise the site plan to show the location and termination of the building sewer as noted on sheet P1. Reference: Section 107.2.1, IBC 2018. 3. The rim elevation of the next upstream sanitary cleanout (9460*02) is approximately 2368', which is the same as the first floor elevation (2368'). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. 4. Clarify the arrangement of the crickets along the east-west parapet extensions shown on the roof plan of sheet A1.0: the crickets do not terminate at the end the parapet extensions unlike those shown on the mechanical roof plan on sheet M1. 5. Provide secondary (overflow) roof drainage. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018. |
| 07/20/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 07/23/2020 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 07/27/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments. Also provide a written response. 1. Ref; Cover plan sheet. Revise the reference to 2012 NEC to the currently adopted 2017. 2. Revise the IECC calculations to the current 2018. 3. Ref; Plan sheets E1 and E2. The Outdoor lighting calcs on each plan do not correlate with each other. 4. Provide a complete luminaire schedule for all the lighting that also correlates with the Outdoor lumen calcs for exterior lighting. 5. Verify luminaire lamp output color temperature to comply with sec 402.1 of the Outdoor Lighting Code. 3500K. 6. Provide a note on the plan requiring a Special Inspection for Outdoor Lighting required if applicable per section 104.2.2, 106.2.1. 7. Indicate whether the new service overhead or underground fed by the utility. Comply with 2018 IBC Amendments sec 112.1.1. 8. Verify that the sequence of operation for the exhaust fans complies with the Mechanical requirements. See Mechanical plan. Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code. |
| 08/07/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: Silver Street Warehouse T20CM04388 TRANSMITTAL DATE: August 7, 2020 1. Zoning has reviewed the building plans for compliance with the development package DP20-0072. While the building plans are consistent with the DP as it relates to the zoning review purview of the building footprint, building height, square footage, site conditions etc., zoning cannot approve the building plans until the DP is approved and all PDSD Commercial Plans reviewers have approved the building plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
| 08/13/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | The Development Package must be approved first. |
| 08/31/2020 | PIMA COUNTY | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Reviewer: Chris Anderson BUILDING – COMMERCIAL 1. Please respond to all review comments in writing. 2. Please submit structural calculations that are unsecured so that the City reviewer’s stamp can be placed on them. Ref. 2018 IBC 107.2.1. 3. Submit a filled out City of Tucson Special Inspections Certificate. 4. Roof insulation shown on the Building Section A/A2.0 does not match the roof insulation shown on detail 8/SD1; neither of which match the prescriptive insulation for metal buildings shown in 2018 IECC Table C402.1.3. Coordinate. 5. The exterior wall insulation shown in the Wall Legend, sheet A1.0, does not match the prescriptive wall insulation for mass walls shown in 2018 IECC Table C402.1.3. 6. Submit a building envelope COMcheck since the prescriptive insulation methods of 2018 IECC Table C402.1.3 are not being used and add the U-factors and for exterior wall fenestration (swing doors) used in the COMcheck to the Door schedule on sheet A3.0. |
| 08/31/2020 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/31/2020 | JGARCIA1 | APPROVAL SHELF | Completed |
| 08/31/2020 | JGARCIA1 | OUT TO CUSTOMER | Completed |
| 08/31/2020 | JGARCIA1 | REJECT SHELF | Completed |