Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T20CM03992
Parcel: 12217001A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM03992
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/02/2020 JPEELDA1 FIRE REVIEW Approved
07/06/2020 JOHN VAN WINKLE ENGINEERING REVIEW Passed
07/07/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change If the shower does not have a listed, pre-fabricated receptor (e.g. a concrete shower base), provide details to show that the construction of the shower floor complies with the requirements of Section 421.5, IPC 2018.
07/07/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. There are two outside air calculations in sheet M1: clarify which one is correct. Reference: Section 107.2.1, IBC 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacity of DAC-1 in a room that is also served by HP-1. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
07/07/2020 ROBERT SHERRY WATER REVIEW Completed
07/14/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/29/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/29/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A3; Floor Plan: A section cut at the restrooms references 1/A6. Please revise that reference.
2. Sheets A3 and A5; Floor Plans: Please indicate the shower seat, handshower, and grab bar locations on these plans per the ICC/ANSI Section 608.
3. Sheets A3 and A5; Floor Plans: The showers must have the 36"x48" clear floor space to meet the accessibility requirements indicated in the ICC/ANSI Figure 608.2.1. Please verify.
4. Sheets A3 and A5; Floor Plans: The restroom doors must open out of the stall and be located across from the water closet as indicated in the ICC/ANSI Figure 604.9.2. Please verify.
5. Sheet A3; Floor Plan: Please indicate the location of the required service sink.
6. Sheet A4; Ceiling Plan: Please indicate the exit signs on this plan.
7. Sheet A5; Enlarged Restroom Plan: A section cut at the restroom is not complete. Please provide.
8. Sheet A6; Interior Partition Sections 4 and 5: The partition studs indicate 2x6 and 2x3 5/8". For metal studs, omit the 2x portion of the call out.
9. General: Please provide written responses to all review comments.
08/17/2020 STEVE SHIELDS ZONING REVIEW Approved