Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM03330
Parcel: 14025008A

Address:
5761 S PARK AV 1

Review Status: Completed

Review Details: PLANS OK TO SUBMIT - COMM

Permit Number - T20CM03330
Review Name: PLANS OK TO SUBMIT - COMM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/05/2020 STEVE SHIELDS ZONING REVIEW Needs Review
06/08/2020 LOREN MAKUS ENGINEERING REVIEW Needs Review
06/17/2020 ENEWCOM1 ADA REVIEW Passed
06/17/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change I must apologize in delaying the processing of your eight Rio Mercado apartment projects. I was trying to dig out the information I needed to complete the OK to Submit for each one, and I spent a lot of time looking for that information. I typically spend about 30 minutes looking up information for the project, entering that information into Permits Plus, then approving the OK to Submit. I've spent a great deal more time looking for pertinent information on these projects. My hope is that you can provide this information to me on a revised Cover Sheet (or secondary Code Analysis Sheet) so I can process the projects.

On a typical Cover Sheet (or a secondary Code Analysis Sheet), I need a Code Analysis for each structure. In this case, I have six apartment buildings, a clubhouse, and a splash pad/building. Is that correct? On the Cover Sheet, I would need each of those 8 structures identified on a site plan. I need the square footage of the first floor, square footage of the second floor, number of apartment units on the first floor, number of units on the second floor, construction type of each structure, sprinkler information if applicable, occupant load of the first floor, and occupant load of the second floor. I need this information clearly stated on the Cover Sheet (or Secondary Code Analysis Sheet) for each structure. With that information, I can easily complete the OK to Submit for all the structures, and I can establish Plan Review Fees, Permit Fees, and Impact Fees for each. I just couldn't get to that point at this time with the sets you submitted.

Thanks for the information.

Eric
06/17/2020 ERIC NEWCOMB COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
06/17/2020 ENEWCOM1 FIRE REVIEW Needs Review
07/07/2020 ENEWCOM1 WWM REVIEW Needs Review