Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM02722
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/23/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T20CM02722 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditinally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E006 Panel schedule calls out for 42 KAIC rating, but Arc fault table calls out for 22 KAIC and actual Arc Fault calculation is only 6,514 amps ie even a 10 KAIC panel is acceptable. E301 Equipment shed plan needs to use panel P for lighting and receptacle power circuits and not use Panel H1B. This conflicts with NEC Code 225.30. PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). Floor drains & equipment drains in equipment shed can't connect to storm system on plan pages P100 & P101 -IPC 1104.1, 1104.2 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/23/2022 | VVERA1 | OUT TO CUSTOMER | Completed |