Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM02722
Parcel: 13213075A

Review Status: Completed

Review Details: REVISION - - 1ST

Permit Number - T20CM02722
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/23/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T20CM02722

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditinally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E006 Panel schedule calls out for 42 KAIC rating, but Arc fault table calls out for 22 KAIC and actual Arc Fault calculation is only 6,514 amps ie even a 10 KAIC panel is acceptable.
E301 Equipment shed plan needs to use panel P for lighting and receptacle power circuits and not use Panel H1B. This conflicts with NEC Code 225.30.


PLUMBING REVIEW COMMENTS:
Denied
Second Plumbing Review:
1). Floor drains & equipment drains in equipment shed can't connect to storm system on plan pages P100 & P101 -IPC 1104.1, 1104.2


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
09/23/2022 VVERA1 OUT TO CUSTOMER Completed