Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T20CM02722
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/12/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/15/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T20CM02722 rev1 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. A corridor damper shall be installed in corridor ceiling enclosure on all floors on sheet M101 (IMC2018,607.5.4) No response to this correction Not Complied 2.Provide corridor dampers where ducts penetrate corridor ceiling enclosure throughout on 1st floor on sheet M201 (IMC2018,607.5.4) Nothing changed Not Complied 3. Provide duct smoke detector for FCU-1 and 4 they both share common duct of, of the outside air louver on sheet M201 (IMC2018,606.2.2) Nothing changed Not Complied ELECTRICAL REVIEW COMMENTS Conditionally Approved E006 Panel schedule calls out for 42 KAIC rating, but Arc fault table calls out for 22 KAIC and actual Arc Fault calculation is only 6,514 amps ie even a 10 KAIC panel is acceptable. E301 Equipment shed plan needs to use panel P for lighting and receptacle power circuits and not use Panel H1B. This conflicts with NEC Code 225.30. PLUMBING REVIEW COMMENTS: Denied FIRST PLUMBING REVISION REVIEW: 1). DETAIL B ON A001 SHOW OPEN ROOF ON PORTION OF EQUIPMENT SHED, SANITARY FLOOR DRAIN & POOL DRAIN ON P100 & P101 CAN'T RECEIVE STORM WATER. -IPC 1101.3 If you require a dditional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/16/2022 | VVERA1 | OUT TO CUSTOMER | Completed |