Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T20CM02722
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/19/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | IFC 2018, 507.5.1.1 Hydrant for standpipe systems. Buildings equipped with a standpipe system installed in accordance with Section 905 shall have a fire hydrant within 100 feet of the fire department connections. IFC 2018, 1009.8 Two-way Comunication. A two-way communication system complying with Section 1009.8.1 and 1009.8.2 shall be provided at the landing serving each elevator or bank of elevators on each accessible floor that is one or more stories above or below the level of exit discharge. IBC 2018, 3001.2, Emergency elevator communication system for the deaf, hard of hearing and speech impaired. An emergency two-way communication system shall be provided that: 1. Is a visual and text-based and video-based 24/7 live interactive system 2. Is fully accessible by the deaf, hard of hearing and speech impaired, and shall include voice-only options for hearing individuals. 3. Has the ability to communicate with emergency personnel utilizing exisitng video conferencing technology, chat/text software or other approved technology IBC 2018, 3006.3 Hoistway opening protections. Please provide what method of the four you will be using for your project. Hydrants shall be located within 600' of the hydrant as the hose lays not as the crow flys. Please make corrections on correct sheets. Confirm lower level exit signs Questions: Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
07/19/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T20CM02722 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied i. Provide General Structural Notes regarding Loadings, Foundations and all materials used in this project. ii. Submit documentation regarding implementation of Special Inspections and Testing program during construction to observe compliance with the Design Concepts and Specifications. iii. Provide schedule of special inspections as required in IBC Section 1705. iv. Provide concrete data on the drawings for footings, walls, exterior slab, interior slab, beams and columns. F’c max, Max W/C ratio, Max aggregate size, Slump, Entrained Air Percent (+/- 1.5%), Cement Type. v. Balcony guards are to be designed for the loads provide in IBC 2018 Section 1607.8.1. vi. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. vii. Canopies shown on Drawing S601 and S602 are not supported structurally. Provide Sections showing how they are supported. viii. Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. Examples of items that likely should not be deferred include deep foundation elements, deep excavation shoring and prefabricated metal buildings. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. 9. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. provide smoke dampers where duct penetrates corridor wall on all floors penetrating storage rooms (imc2018,607.5.4) 2. provide ventilation calculation schedule (IMC2018,403.3.1.1) 3.Provide kitchen exhaust to all apartment units (IMC2018,403.3.1) 4. show in detail how you are going to protect the ceiling membrane assembly for bathroom and dryer ducts in apartment units (IMC2018,607.6.2) 5.Mechanical systems shall not be located in an elevator shaft (IMC2018,303.8) 6. Provide ceiling radiation dampers where diffuser penetrates ceiling in corridors (IMC2018,607.6.2) 7. duct smoke detectors shall be installed on the return ducts of the RTU's (IMC2018,606.2.1) ELECTRICAL REVIEW COMMENTS Denied E100: Not a code comment, Note number 1 often falls on top of conductor size for circuits. E101: Need to add service receptacles in maintenance and mech rooms. Suggest more than one per room. Suggest another receptacle in North hallway near North entrance door. Should remove lighting fixtures from background. Suggestion applies to all power sheets. E121: No mechanical rooftop circuits or disconnects shown. Is there a note to provide or other direction for rooftop equipment? E203: Keynote on emergency lighting in stairwells should be on all lighting sheets. E302: Show circuits for elevator equipment. E421: Call out power panel location. Comment applies to all units. Suggest to show wiring of at least one unit for typical. PLUMBING REVIEW COMMENTS: Approved |
07/22/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Provide the calculations used to determine the water demand that the proposed 3-inch water meter will be serving. Reference: Section 107.2.1, IBC 2018. 2. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit. Inclusion of the utility drawing from the Development Package for “Reference Only” is not acceptable. |
07/28/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
08/20/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Waterwalk Corporate Lodging @ Tucson Marketplace New Hotel – PAD-15 T20CM02722 (1st Review) TRANSMITTAL DATE: July 28, 2021 1. Zoning has reviewed the building plan for compliance with DP20-0039 and although the building plans match the DP Zoning will not approve until approved by all PDSD Review Staff. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
08/23/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/08/2021 | NGARCIA3 | OUT TO CUSTOMER | Completed |