Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T20CM02722
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/27/2020 | JPEELDA1 | FIRE | REVIEW | Reqs Change | IFC 2018, 507.5.1.1 Hydrant for standpipe systems. Buildings equipped with a standpipe system installed in accordance with Section 905 shall have a fire hydrant within 100 feet of the fire department connections. Notes for testing: IFC 2018, Section 510, Emergency Responder Radio Coverage. 510.1 Emergency responder radio coverage in new buildings. New buildings shall have approved radio coverage for emergency responders within the building based on the existing coverage levels of the public safety communication system utilized by the jurisdiction, measured at the exterior of the building. IFC 2018, 1009.8 Two-way Comunication. A two-way communication system complying with Section 1009.8.1 and 1009.8.2 shall be provided at the landing serving each elevator or bank of elevators on each accessible floor that is one or more stories above or below the level of exit discharge. IBC 2018, 3001.2, Emergency elevator communication system for the deaf, hard of hearing and speech impaired. An emergency two-way communication system shall be provided that: 1. Is a visual and text-based and video-based 24/7 live interactive system 2. Is fully accessible by the deaf, hard of hearing and speech impaired, and shall include voice-only options for hearing individuals. 3. Has the ability to communicate with emergency personnel utilizing exisitng video conferencing technology, chat/text software or other approved technology |
07/27/2020 | ARUIZ1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | ZONING | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | WATER | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | ENGINEERING | REVIEW | Needs Review | |
07/27/2020 | ARUIZ1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/27/2020 | ARUIZ1 | OUT TO CUSTOMER | Completed |