Permit Number: T20CM02353
Parcel: 12620001C

Address:
3400 E ZOO CT

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T20CM02353
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/05/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the following electrical plan review comments. Also provide a written response.
1. Please explain or clarify why there are 2 Overall Site plans and 2 Electrical Lighting Calculation plans with different values in this plan set.
Ref; 2018 IBC sec, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code.
05/05/2020 MARTIN BROWN FIRE REVIEW Approved
05/06/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Specify the type of backflow protection devices or assemblies being applied to the "Life Support Equip" or the "Drum Filter Control Skid" and the type of hazard associated with each application. Reference: Section 608.1, IPC 2018.
2. Provide a backflow prevention assembly for the misting system. Reference: Section 608.1, IPC 2018.
3. Provide the civil plans that show the continuation of the DCW and sanitary waste lines as noted in keynotes #1 and #2 on sheet PF2.1. Refrence: Section 107.2.1, IBC 2018.
4. Verify the the FFE of the support building for the flamingo exhibit is 12" or more above the rim elevation of the next upstream manhole. Reference: Section 714.1, IPC 2018.
05/06/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show that the proposed new buildings and the alterations to existing buildings comply with the energy requirements for the building envelopes (e.g. COMcheck envelope compliance certificate).
2. Provide heating/cooling load calculations for the new packaged air conditioner, RTU-E1.
05/06/2020 ROBERT SHERRY WATER REVIEW Completed
05/07/2020 ELISA HAMBLIN ZONING REVIEW Approved
05/27/2020 LOREN MAKUS ENGINEERING REVIEW Approved
06/12/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet AE0.1; Code Review Plan; Occupancy Table: The existing SF in the Occupancy Table for Booths 1, 2, and 3, and for the Office 4, do not match the SF shown on the Code Review Plan. Please verify.
2. Sheet AE0.1; Code Review Plan; Occupancy Table: In the Occupancy Table, a new area of 314 SF is indicated in "Membership 5". Please verify the SF of that area.
3. Sheet AE0.1; Occupancy Table: The "Membership 5" area uses 50 SF/occupant. Please indicate which Function of Space was used in the IBC Table 1004.5.
4. Sheet SE0.1; General Structural Notes: Note 8 indicates the footing design is based upon minimumIBC soil bearing values in the absence of a soil report. There is an original soil report and an addendum to that report. Please review these reports and revise this note as required.
5. Sheet SE2.2 (Roof Framing Plan); Structural Calculations (Page 3 of 87): A cross beam (exterior column to the existing wall) in the calculations indicates a B1 beam (6x12), while the Roof Framing Plan indicates a B2 (4x8). Please coordinate.
6. Sheet SF1.1; Low Roof Framing Plan: Please indicate the roof joist size, or reference it to the schedule on Sheet SF6.1.
7. General: Please provide a Special Inspection Certificate with Parts A and B completed.
8. General: Please provide written responses to all review comments.