Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20CM02240
Parcel: 12310001H

Review Status: Completed

Review Details: RESUBMITTAL - TI ALL

Permit Number - T20CM02240
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/23/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet g1.0; State Health Codes: Please revise the ICC/A117.1 Code to the 2009 Edition.
2. Sheet a1.0; Floor Plan Sheet Legend: This Table indicates 'See Sheet Series "X" '. Please verify.
3. Sheet a1.0; Reference Floor Plan: The east wall of Restrooms 123 and 124 indicates a CH2 Wall Type. That Wall Type is not indicated on Sheet a9.0. Please verify.
4. Sheet a2.0; Reflected Ceiling Plan: It appears more directional exit signage should be located in the corridor on the east end of this space leading to the south exit. Please verify.
5. Sheet a6.0; Wall Section 1: Please indicate this section on the Floor Plan (Sheet a1.0) or in a Keynote on that sheet.
6. Sheet a7.1; Wall Elevation 14: The water closet should not be indicated on this elevation. Please verify.
7. Sheet a7.2; Wall Elevation 16: The horizontal grab bar should be indicated on this elevation. Please verify.
8. General: Please provide written responses to all review comments.
07/23/2020 ROBERT SHERRY WATER REVIEW Completed
07/23/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.
07/23/2020 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please provide complete compliance with the 2018 IECC for the lighting.
07/23/2020 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Clarify how the outdoor air calculation for terminal units 7, 8. 9, 10, 12, and 13 relates to the ASHRAE 170 outdoor air calculations. Reference: Section 107.2.1, IBC 2018