Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T20CM00178
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/09/2020 | IMONSHI1 | ZONING | REVIEW | Approved | |
| 01/09/2020 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating/cooling load calculations. 2. HP-2 has a total cooling capacity greater than 54,000 BTUH. Provide an economizer. 3. Complete the ventilation calculations by including the supply airflow to the restrooms. Hint: enter each restroom separately in the calculations. 4. Coordinate the duct design for the northeast corner office with the reflected ceiling plan (i.e. include the return). 5. Show the size, route, termination, and material for the condensate drains. 6. Show the size and routes of the outside air ducts. SHow the balancing data. 7 Provide balancing data and the control sequence for the restroom exhaust fans. |
| 01/09/2020 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 01/09/2020 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
| 01/09/2020 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0 (Keynote Legend); Sheet A2.0 (Detail 4): The floor plan on Sheet A1.0 indicates the new interior walls as A2, which the Legend indicates as new 2x4 studs. Detail 4, which is cut through those walls, indicates metal studs. Please coordinate and indicate the wall stud spacing. 2. Sheet A1.1; Water Closet Clearance; Keynote Legend: The Keynote Legend indicates HC1 and HC2 grab bars at 34" above finish floor, while the Water Closet Clearance indicates 3'-0" above finish floor. Please coordinate. 3. General: Please provide written responses to all review comments. |
| 01/09/2020 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 01/09/2020 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 01/09/2020 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 01/10/2020 | JVINCEN1 | FIRE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/15/2020 | AMARTIN1 | OUT TO CUSTOMER | Completed |