Address Search: 998 S CHERRY AV
Search
Parcel Attributes
| Parcel | 124181920 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Millville |
| Major Street & Route | Gateway Route |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 998 S CHERRY AV
Date - 08/17/2026 2:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 3/4 Mile East To Campbell Avenue | 486 |
Permits
Address: 998 S CHERRY AV
Date - 08/17/2026 2:43 a.m.
Total Number Of Permits - (24)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22CM05485 | Issued | 07/19/2022 | 02/25/2025 | Commercial Building | Verizon Wireless proposes to remove (1) microwave antenna and install (1) new microwave antenna. Als | |
| TC-COM-0425-00861 | Complete | 04/29/2025 | 02/18/2026 | Commercial Building | The Canary Systems PV system will consist of 30 Silab 520W modules and metal decking mounted on a new steel parking canopy. Microinverters will supply power through an existing TEP service. | |
| TC-COM-0425-00861 | Complete | 04/29/2025 | 02/18/2026 | UNIT M1 | Commercial Building | The Canary Systems PV system will consist of 30 Silab 520W modules and metal decking mounted on a new steel parking canopy. Microinverters will supply power through an existing TEP service. |
| TC-COM-0425-00861 | Complete | 04/29/2025 | 02/18/2026 | UNIT M2 | Commercial Building | The Canary Systems PV system will consist of 30 Silab 520W modules and metal decking mounted on a new steel parking canopy. Microinverters will supply power through an existing TEP service. |
| TR-ROW-0223-00337 | Complete | 02/06/2023 | 04/18/2023 | Right-of-Way (ROW) | Behind our business as part of our property is a large fenced in yard where we have our garage. We currently have a fence around this yard with an electronic gate that is on a cement track (15'+9"). This gate allows access from the road, Warehouse Ave that runs along the northern edge of our property, to the yard and the garage. There is a 45" gap between the cement gate track and the curb at the street (Warehouse Ave). This 45" gap runs the length of the 15'+9" cement gate track. Currently there is loose dirt and gravel in this area. What we would like to do, and we appreciate your time looking at this, is we want to fill in that gap with cement. The pour would be from the gate track to the curb (45") along the entire 15'+9" length. | |
| TD-DEV-0125-00030 | Complete | 01/28/2025 | 08/24/2028 | Development Package | The Canary Systems PV system will consist of 30 modules plus metal decking on one new steel parking canopy in the existing parking lot. | |
| TD-DEV-0125-00030 | Complete | 01/28/2025 | 08/24/2028 | UNIT M1 | Development Package | The Canary Systems PV system will consist of 30 modules plus metal decking on one new steel parking canopy in the existing parking lot. |
| TD-DEV-0125-00030 | Complete | 01/28/2025 | 08/24/2028 | UNIT M2 | Development Package | The Canary Systems PV system will consist of 30 modules plus metal decking on one new steel parking canopy in the existing parking lot. |
| TC-UTL-0125-00005 | Issued | 01/21/2025 | 09/08/2025 | Utilities Permit | · REMOVE (6) EXISTING ANTENNAS · REMOVE ALL EXISTING NOKIA RADIOS · REMOVE (12) LINES OF COAX · REUSE EXISTING (1) DC6-48-60-0-8C AND (1) DC6-48-60-0-8C-EV · REUSE (1) WCS-IMFQ-AMT FILTERS B1 · REMOVE EXISTING TMAs · INSTALL (3) 840-370966K ON POS A1/B1/C1 · INSTALL (3) AIR6419 B77D+AIR6419 B77G STACKED ON POS A2/B2/C2 · INSTALL (3) 840-370799K ON POS A3/B3/C3 · INSTALL (3) 4490 B5/B12A ON B2B'S TO BE SHARED W/ (3) 4415 B30S FOR P1 A/B/C TO BE INSTALLED ON (N) PIPES · INSTALL (3) 4890 B25/B66 ON B2B'S TO BE SHARED W/ (3) 4478 B14'S FOR P3 A/B/C TO BE INSTALLED ON (N) PIPES · REUSE EXISTING DC AND FIBER TRUNKS · INSTALL (2) NEW 6AWG POWER TRUNK · INSTALL (1) NEW DC9-48-60-24-8C-EV (SQUID) | |
| T00CM03700 | FINAL | 07/26/2000 | 08/07/2001 | COMBO | ADDITION:CELLULAR EQUIPMENT BLDG/ANTENNA | |
| T02AN01150 | ISSUED | 12/16/2002 | N/A | M2 | ADDRNEW | |
| T02CM04436 | FINAL | 09/20/2002 | 06/17/2003 | M2 | COMBO | CELL SITE |
| T02EX01475 | CLOSED | 12/27/2002 | 02/25/2003 | EXCAV | EXCA:REPAIRSTO INSTALL 24LF OF FIBER OPTIC CONDUT | |
| T05CM00175 | WITHDRWN | 01/13/2005 | N/A | M2 | COMBO | CELL TOWER:CO LOCATE ANTENNA ON EXISTING TOWER |
| T11CM01985 | SI_XPIRE | 06/27/2011 | 02/16/2013 | COMBO | REPLACE ANTENNAS, ADD TOWER MOUNTED AMPLIFIERS, STRUCTURALLY REINFORCE TOWER | |
| T12CM03377 | WITHDRWN | 06/11/2012 | N/A | COMBO | REPLACEMENT OF EXISTING ANTENNA MOUNT, INSTALLATION OF 2 NE ANTENNAS PER SECTOR FOR 6 TOTAL. RELOCATION OF 2 EXISTING ANTENNAS, 3 NEW RRH'S, 1 NEW RAY CAP, 1 NEW GPS ANTENNA, INSTALLATION OF NEW BATTERY AND EQUIPMENT CABINET ON EXISTING PAD | |
| T14CM00925 | EXPIRED | 02/18/2014 | 12/27/2014 | COMBO | REPLACE ANTENNAS AND ASSOCIATED EQUIPMENT | |
| T17CM00315 | FINAL | 01/13/2017 | 02/19/2018 | COMBO | ADDING NEW DIESEL DRIVEN GENERATOR | |
| T17CM00316 | WITHDRWN | 01/13/2017 | N/A | COMBO | UPGRADE ELECTRICAL SERVICE FOR CELL TOWER | |
| T17CM01822 | FINAL | 03/07/2017 | 09/03/2018 | COMBO | REPL 12 ANTENNAS VERIZON | |
| T19RW05777 | FINAL | 09/30/2019 | 11/29/2019 | ROW | JOB WILL REQUIRE ACCESS TO MH #11318 TO PLACE FIBER | |
| T20CM00178 | FINAL | 01/09/2020 | 07/27/2020 | COMBO | TI: OFFICE/ WAREHOUSE | |
| T21RW00197 | FINAL | 01/14/2021 | 03/22/2021 | ROW | From the existing COX vault, SW Corner of 998 S Cherry Ave, begin 10' trench/bore placing 1-2'' conduit and 48ct fiber heading North to out of ROW | |
| T21RW03552 | FINAL | 07/29/2021 | 11/07/2021 | ROW | NE corner of E Warehouse Ave and S Kino Pkwy. 230' Pull Through Existing Conduit 432ct Fiber into out of ROW. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. |
Record Requests
Address: 998 S CHERRY AV
Date - 08/17/2026 2:43 a.m.
Total Number Of Requests - (1)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0125-00412 | Complete | 01/16/2025 | 02/05/2025 | Requests | *BUILDING PERMIT RECORDS UPLOADED. FOR NEWER/CURRENT INFORMATION PLEASE CHECK PROPERTY RESEARCH ONLINE.(https://pro.tucsonaz.gov/).*TD#10-47-97** Looking for electrical plans. |