Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T20BU00039
Parcel: 12404100A

Address:
900 E 2ND ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T20BU00039
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/29/2020 AMARTIN1 PLUMBING-COMMERCIAL REVIEW Needs Review Complete sheet SP-102: all 26 keynotes on the drawings are labeled "XX".
02/25/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet SP-001: Please provide a sealed, signed, and dated letter from the building structural engineer of record stating the loads imposed on the structure from the pool and spa drawings do not exceed the design loads applied to the building on the approved permit drawings.
2. Sheet SP-001: The City of Tucson requires all lettering (upper and lower case) to be a minimum of 3/32" in height. Please revise as required.
3. Sheet SP-101; Deck Equipment Notes: Notes D1, D2, and D3 indicate details that are incomplete. Please revise.
4. Sheet SP-101; Design Elements Notes: Notes DE1 through DE13 indicate details that are incomplete. Please revise.
5. Sheet SP-101; Imbeds Notes: Notes I1 through I9 indicate details that are incomplete. Please revise.
6. Sheet SP-101; Electrical Notes: Notes E1, E2, E3, E5, E6, and E7 indicate details that are incomplete. Please revise.
7. Sheet SP-102; Pool/Spa Plans: The pool/spa Plumbing Notes on the plans are not complete. Please revise.
8. Sheet SP-103: Please provide a sealed, signed, and dated letter from the building structural engineer of record stating the loads imposed on the structure from the pool and spa equipment drawings do not exceed the design loads applied to the building on the approved permit drawings.
9. Sheet SP-103; Circulation Equipment Notes: Notes C3 through C6 indicate details that are incomplete. Please revise.
10. Sheet SP-103; Sanitation Equipment Notes: Notes S1, S2, S4, and S5 indicate details that are incomplete. Please revise.
11. Sheet SP-103; Electrical Notes: Notes E8, E9, and E10 indicate details that are incomplete. Please revise.
12. Sheet SP-103; Valves and Gauges Notes: Note V5 indicates a detail that is incomplete. Please revise.
13. Sheet SP-103; Structural Elements Notes: Notes ST1, ST3, and ST4 indicate details that are incomplete. Please revise.
14. Sheet SP-301; Pool/Spa Sections: Please indicate walls/floors thicknesses and reinforcement, or reference details with that information. Inspectors will not review structural calculations for that information.
15. General: Please provide written responses to all review comments.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/27/2020 ARUIZ1 APPROVAL SHELF Completed
03/27/2020 ARUIZ1 OUT TO CUSTOMER Completed
03/27/2020 ARUIZ1 REJECT SHELF Completed