| 02/28/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | NO COMMENTS PER JIM FEMLING |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
| 02/28/2019 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | Street Maintenance irrigation runs parallel with 22nd St. in the city right of way. Any driveways would need to be sleeved, and any modification or damages would need to be repaired by the contractor. Call Paul Rosenboom with any questions (520)419-7064 |
| 02/28/2019 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
| 02/28/2019 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
| 03/08/2019 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 03/20/2019 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approv-Cond | March 20, 2019 SUBJECT: Encantada at Rita Ranch T19PI00004 (I-2019-003) PROJECT REVIEWER: Zelin Canchola, TDOT Review Section RESUBMITTAL REQUIRED: DOT Review Section has reviewed the PIA Plan for Traffic Engineering. The proposed plan is acceptable however it requires the following change for a conditional approval. Changes can be submitted in a PDF to expedite approval. Page 7 of 7 1. Eliminate crosswalk and stop bar striping 2. Change - place supplement "right turn" RF-5F on top of Right turn signs. 3. Add striping quantities. If you have any questions I can be reached at 837-6659 or zelin.canchola@tucsonaz.gov |
| 03/26/2019 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 03/26/2019 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | March 25, 2019 SUBJECT: Offsite Improvement Plans for La Encantada at Rita Ranch (Valencia Rd) PROJECT REVIEWER: Richard Leigh, TDOT, TDOT Eng. Review RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and recommends a conditional approval at this time. The following comments need to be addressed and plans revised prior to submitting mylar plan set for signatures. Please submit a PDF copy for review prior to submitting mylars. 1. Include the plan number "I-2019-003" in the title block of each sheet. 2. Include the PIA activity number "T19PI00004" on cover sheet. 3. Sheet 2, General Paving Note 3: Revise note to indicate the use of COT Mix No. 2 for the asphaltic concrete. 4. Sheet 2: Revise roadway sections to indicate the placement of 6' wide sidewalk along Valencia Rd. pursuant to section 10-01.4.1.A.1.a of the Technical Standards Manual. 5. Sheet 3: Revise drawing to indicate that the cross slope in the pedestrian crosswalk areas at the driveways will not exceed 2%. 6. Sheet 4: Revise drawing to relocate curb access ramp on the east side of the east driveway south to be more in line with west ramp. Pursuant to AZ Revised Statute 9-499.02 ramps must align with each other where the cross the street. 7. Sheet 4, Sections 2 & 3: Indicate type of filter fabric. Filter fabric shall be Mirafi 140N or an equivalent type. 8. Sheet 5: Verify P.A.G. Standard Detail called out for proposed catch basin and indicate wing lengths. 9. Sheet 5: Provide an additional manhole in the storm drain run within Valencia Road. Pursuant to S.M.D.D. Section 10.9.1.8, a minimum 300 Ft minimum manhole spacing is recommended for conduits 30 In. or less. 10. Sheet 6: Provide a longitudinal section for the 3 - 30 In storm drains crossing Valencia Road. If you have any questions, I can be reached at 837-6647 or emailed at Richard.Leigh@tucsonaz.gov. |
| 03/26/2019 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |