Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T19CM06141
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2019 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/26/2019 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 08/26/2019 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 08/26/2019 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 08/26/2019 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.0; Deferred Submittal: A deferred submittal will be required for the new stair. Please indicate on this sheet. 2. Sheet A2.0; Keynotes: Note 6 indicates a new 15'-0" opening in the existing demising wall. Please provide details on this sheet for that opening, and structural calculations as required. 3. Sheet A2.0 (Keynotes); Sheet E1.1 (Floor Plan 2): The electrical floor plan indicates a floor mounted transformer, while Keynote 9 on Sheet A2.0 indicates a wall mounted transformer. Please coordinate. 4. Sheet A2.0 (Floor Plan); Sheet E1.1 (Floor Plan 2): The electrical floor plan indicates one new transformer, while the architectural floor plan indicates two. Please coordinate. 5. Sheet A2.0; Detail 3: Please provide the base plate size and the quantity and size (diameter and length) of the expansion anchors on this detail. 6. General: Please provide written responses to all review comments. |
| 08/26/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 08/27/2019 | MRESS1 | ENGINEERING | REVIEW | Passed | |
| 08/27/2019 | MALLORY RESS | ZONING | REVIEW | Approved | |
| 08/27/2019 | MROSS2 | FIRE | REVIEW | Reqs Change | Will need an analysis of the fire sprinkler system by an FPE to determine if an upgrade will be required. |