Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel14108521E
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningPAD-26, I-1
Airport Environs Zone

NCZ-A and NCZ-B Davis Monthan AEZ Paddle

Tucson WardWard 4
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/17/2026 3:22 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-95-16 Wilmot / I-10 8655 04/03/1996 8677

Permits

Parcel Number - 14108521E
Date - 08/17/2026 3:22 a.m.
Total Number Of Permits - (26)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0225-00224 Complete 02/04/2025 12/01/2025 UNIT 100 Commercial Building Electrical Service Upgrade, From 200a 480v 3phase 4 wire TO 400a 480v 3phase 4 wire Existing UG
TR-ROW-0226-00245 Needs resubmittal 02/27/2026 N/A Right-of-Way (ROW) Union Pacific is needing to flag attached roads at the railroad crossing for maintenance. NOTE: WORK IS LOCATED AT RAILROAD CROSSING ON WILMOT ROAD S/OF E LITTLETOWN RD - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY.
TC-COM-0325-00453 Void 03/06/2025 N/A UNIT 100 Commercial Building VOID: YL - Duplicate/Same scope of work as existing application permit (TC-COM-0225-00224). Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. For questions: Building_Official@tucsonaz.gov Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf - 200a to 400a service upgrade for future tenant.
TR-UTL-0623-01729 Complete 06/06/2023 10/24/2023 Right-of-Way (ROW) - Utility SWG 12" steel HP Gas Relocation ahead of COT Valencia Widening (Job No. SR14, City Project Manager: Bob Roggenthen). In addition, SWG is extending 4" plastic distribution facilities to reinforce the system and support growth in the area. Approximately 1,030’ within COT ROW.
TC-COM-1223-02915 Complete 12/22/2023 06/23/2024 Commercial Building Replace (3) parallel sets of 500 KCMil Copper Conductors from TEP Transformer to Term Can Due to Vehicle Damage to TEP Transformer Replacing with (3) sets of 500 KCMil Copper Conductors LIKE FOR LIKE
T12BU00467 Final 04/12/2012 11/17/2012 TENTS 2 CANOPIES
T13CM00433 Final 01/24/2013 10/07/2013 #180 COMBO INSTALL RACKING
T14BU00928 Expired 08/18/2014 03/30/2015 #100 TANKS INSTALL 4 - 1000 GAL. LPG TANKS;COMM
T14CM03565 Withdrwn 06/11/2014 N/A #100 COMBO TEMPORARY OFFICE TRAILER/CONSTRUCTION
T14CM05156 Final 08/08/2014 03/14/2015 COMBO SPLIT ELECTRIC METER
T14CM06100 Expired 09/16/2014 08/09/2015 #100 COMBO INTERIOR REMODEL OF OFFICE SPACE
T15CM02076 Withdrwn 03/31/2015 N/A COMBO NEW 200AMP SERVICE
T16CM06077 C of o 08/03/2016 10/03/2017 #100 COMBO TI; ENCLOSE THE STORAGE AREA
T16FC00211 Final 11/04/2016 10/02/2017 FIRECONS Add 45 drops and sprinklers off existing fire sprinkler system
T17CM02998 C of o 04/18/2017 12/20/2017 #100 COMBO INDUISTRIAL/ WAREHOUSE
T17CM03292 L of c 04/27/2017 12/18/2017 #100 COMBO TI: RACKING
T17FC00383 Final 05/09/2017 12/05/2017 FIRECONS STE 180 - Add 42 Pendant Sprinklers
T17FC00463 Final 06/02/2017 12/25/2017 FIRECONS INSTALLATION OF NEW FIRE ALARM SYSTEM.
T17RW01935 Final 05/05/2017 10/03/2017 ROW ACCESSING 3 MANHOLES
T18RW03082 Final 07/13/2018 07/10/2019 ROW New 500 lf of 8" PVC sewer line going west on Littletown road from east side of Kolb Road. Remove and replace the entire travel lane width with 3" AC over 6" ABC or existing pavement thickness. Single chipseal application for the full width of the roadway to be provided. DEVELOPMENT PLAN NUMBER: P18SC0018 ADDRESS ON APPLICATION: 6701 S KOLB RD NOTE: APPLICANT SHALL KEEP LITTLETOWN OR CENTENNIAL OPEN TO TRAFFIC AT ONE TIME (NOT BOTH AT THE SAME TIME) FOR CONTINGENCY TRUCK TRAFFIC 12/11/18 - PLAN CHANGE / TRAFFIC SWITCH PLANNED FOR 12/19/18. 4/1/19 TCP ADDITION FOR FINAL STRIPING
T19CM06141 L of c 08/26/2019 04/05/2020 #100 COMBO TI: WAREHOUSE EXPANSION
T19CM06795 Final 09/18/2019 04/17/2023 #100 COMBO TI: STORAGE RACKS
T19FC00489 Final 06/24/2019 03/03/2020 FIRECONS Monitoring Takeover
T19FC00744 Final 09/16/2019 03/31/2020 FIRECONS Addition of a new NAC Panel powered by a dedicated 120VaC circuit. New Initiating Devices, including (2) pull stations and (1) smoke detector. New Notifications including (12) Horn Strobes
T19OT00490 C of o 06/04/2019 12/28/2019 C-OF-O WAREHOUSE
T21FC00675 Final 09/02/2021 04/26/2022 FIRECONS existing monitoring change.